Document Database (DocDB) for DUNE and LBNF


DocDB Home ]  [ Search ] [ Last 20 Days ] [ List/Add Authors ] [ Events ] [ DUNE Help ] [ Topics ]

TDR Version - DUNE FD Interface Document: Installation Interfaces to SP TPC Electronics

Document #:
DUNE-doc-7000-v2
Document type:
DUNE document
Submitted by:
Anne Heavey
Updated by:
Anne Heavey
Document Created:
05 Feb 2018, 14:13
Contents Revised:
19 Jun 2018, 19:07
Metadata Revised:
25 Apr 2020, 10:41
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Other Versions:
Abstract:
DUNE FD Interface Document: Installation Interfaces to SP TPC Electronics

Moved to EDMS 2145177
https://edms.cern.ch/document/2145177

Files in Document:
Notes and Changes:
include the suggestions from Farshid Feyzi plus additional editing from Marco Verzocchi, based on the discussions with Farshid and Terri Shaw of 12 June 2018. In particular the responsibility for the CE chimneys (design, procurement, testing, and installation) is assigned to the CE consortium, in coordination with technical coordination. The racks and cable trays on top of the cryostat, as well as the cable trays inside the cryostat attached to the DSS are a responsibility of technical coordination. Depending on the funding model for technical coordination the possibility of moving these items to the CE consortium can be considered, but the technical coordination should retain the responsibility for approving the design of these items.
Referenced by:
  • DUNE-doc-6338: OBSOLETE: DUNE FD Interface Documents: Technical Coordination
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List/Add Authors ] [ Events ] [ DUNE Help ] [ Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact Service Desk



DocDB Version 8.8.9, contact Document Database Administrators