8255-v2 |
ProtoDUNE - SP Lessons Learned |
Regina Rameika |
IPR Jul 2020
ProtoDUNE
IPR Oct 2019
May 2020 Directors Review
Lessons Learned
|
05 Feb 2021 |
12367-v2 |
Lessons learned from ProtoDUNE, details for the SP-CE consortium |
Marco Verzocchi |
IPR Jul 2020
IPR Oct 2019
TPC Single-Phase
May 2020 Directors Review
Lessons Learned
|
05 Feb 2021 |
44-v65 |
LBNF Overall Org Charts |
Elaine McCluskey |
DOE CD-3a Review
Director's CD-3A Review of LBNF
IPR Jan 2021
Org/Staffing
|
26 Jan 2021 |
21681-v3 |
January 2021 IPR presentation: Special Informational Breakout on Far Detector 2 and Vertical Drift |
Marzio Nessi et al. |
Near Detector
Far Detector
IPR Jan 2021
|
08 Jan 2021 |
2115-v23 |
LBNF/DUNE Other Schedule Reports for Reviews |
None |
None
|
30 Aug 2020 |
2096-v2 |
LBNF Target Chase Nitrogen Fill & Purge System Initial Design |
Dave Pushka |
Mechanical
Beamline
|
20 Apr 2017 |
42-v33 |
DUNE Org Charts |
Maxine Hronek |
IPR Oct 2019
IPR Jan 2021
Org/Staffing
DUNE Collaboration
|
09 Dec 2020 |
82-v10 |
OBSOLETE: LBNF/DUNE Configuration Management Plan |
Jack Fowler et al. |
Director's Oct 2018 Cost/Schedule Review
Systems Engineering
IPR Oct 2019
Change Control
IPR Jan 2021
May 2020 Directors Review
IPR Jul 2019
|
09 Dec 2020 |
122-v4 |
Environmental Assessment, FONSI, and Environmental Review Forms |
Rod Walton |
Far Site CF
NEPA
Near Site CF
IPR Jan 2021
May 2020 Directors Review
IPR Sep 2020 (EXC/BSI)
IPR Jul 2019
|
09 Dec 2020 |
328-v15 |
Far Site Shaft Hoisting Assumptions and Parameters |
Syd De Vries |
Far Site CF
DOE CD-3a Review
IPR Jul 2020
IPR Oct 2019
Director's CD-3A Review of LBNF
May 2020 Directors Review
Interfaces
IPR Sep 2020 (EXC/BSI)
|
03 Nov 2020 |
716-v1 |
Critical Decision 1 Approval for LBNF/DUNE |
Author Non-Collaborator |
DOE CD-3a Review
IPR Jul 2020
Project Management
IPR Sep 2020 (EXC/BSI)
|
24 Aug 2020 |
142-v1 |
LBNE CD-0 Mission Need Statement |
Author Non-LBNF |
DOE CD-3a Review
IPR Jul 2020
Project Management
Director's CD-3A Review of LBNF
IPR Sep 2020 (EXC/BSI)
|
24 Aug 2020 |
9564-v4 |
OBSOLETE - DUNE Far Detector Design Review Plan |
Farshid Feyzi |
Far Detector
IPR Oct 2019
Reviews
Internal
|
07 Jul 2020 |
1-v10 |
DUNE Governance Document |
Robert J. Wilson |
IPR Jul 2020
Collaboration Management
IPR Oct 2019
Institutional Board
|
30 Jun 2020 |
6670-v5 |
TDR Version - DUNE FD Interface Document : SP APA to SP TPC Electronics |
David Christian et al. |
Electronics
IPR Oct 2019
APA
TPC Single-Phase
Interfaces
WBS
|
29 Jun 2020 |
602-v3 |
The LBNF Cryogenics Infrastructure at the Far Site |
Min Jeong Kim et al. |
DOE CD-3a Review
IPR Oct 2019
Director's CD-3A Review of LBNF
May 2020 Directors Review
Design Report
Cryo Infrastructure
|
04 May 2020 |
6667-v3 |
TDR Version - DUNE FD Interface Document: SP APA to SP Photon Detector |
Alberto Marchionni et al. |
IPR Oct 2019
APA
TPC Single-Phase
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
6718-v5 |
TDR Version - DUNE FD Interface Document: SP Photon Detector to SP TPC Electronics |
David Christian et al. |
Electronics
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
7102-v1 |
TDR Version - DUNE FD Interface Document: Software and Computing to SP APA |
Alberto Marchionni et al. |
IPR Oct 2019
APA
Software and Computing
Interfaces
WBS
|
25 Apr 2020 |
7105-v1 |
TDR Version - DUNE FD Interface Document: Software and Computing to SP Photon Detector |
Andrew Norman et al. |
IPR Oct 2019
TPC Single-Phase
Software and Computing
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
7108-v1 |
TDR Version - DUNE FD Interface Document: Software and Computing to SP TPC Electronics |
Marco Verzocchi |
Electronics
IPR Oct 2019
TPC Single-Phase
Software and Computing
Interfaces
WBS
|
25 Apr 2020 |
7048-v1 |
TDR Version - DUNE FD Interface Document: Calibration to SP APA |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
APA
TPC Single-Phase
Interfaces
WBS
|
25 Apr 2020 |
7051-v2 |
TDR Version - DUNE FD Interface Document: Calibration to SP Photon Detector |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
TPC Single-Phase
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
7054-v1 |
TDR Version - DUNE FD Interface Document: Calibration to SP TPC Electronics |
David Christian et al. |
Electronics
IPR Oct 2019
Calibration
TPC Single-Phase
Interfaces
WBS
|
25 Apr 2020 |
7060-v2 |
TDR Version - DUNE FD Interface Document: Calibration to DP Photon Detector |
Burak Bilki et al. |
TPC Dual-Phase
IPR Oct 2019
Calibration
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
7063-v1 |
TDR Version - DUNE FD Interface Document: Calibration to DP TPC Electronics |
Dario Autiero et al. |
TPC Dual-Phase
Electronics
IPR Oct 2019
Calibration
Interfaces
WBS
|
25 Apr 2020 |
6868-v1 |
TDR Version - DUNE FD Interface Document: Calibration Task Force to DUNE Software and Computing |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
Software and Computing
Interfaces
WBS
|
25 Apr 2020 |
6829-v0 |
TDR Version - DUNE FD Interface Document: Facility to Calibration Task Force |
Farshid Feyzi et al. |
Education & Outreach
Far Site CF
IPR Oct 2019
Calibration
Interfaces
WBS
|
25 Apr 2020 |
6994-v3 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to SP APA |
Eric James et al. |
Project Management
IPR Oct 2019
APA
TPC Single-Phase
Interfaces
Installation/Integration
|
25 Apr 2020 |
6997-v1 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to SP Photon Detector |
Eric James et al. |
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
Photon Detection
Installation/Integration
|
25 Apr 2020 |
7000-v2 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to SP TPC Electronics |
David Christian et al. |
Project Management
Electronics
IPR Oct 2019
TPC Single-Phase
Interfaces
Installation/Integration
|
25 Apr 2020 |
7003-v1 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to DP CRP |
Dominique Duchesneau et al. |
TPC Dual-Phase
IPR Oct 2019
CRP
Interfaces
WBS
Installation/Integration
|
25 Apr 2020 |
7006-v3 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to DP Photon Detector |
Dominique Duchesneau et al. |
TPC Dual-Phase
Project Management
IPR Oct 2019
Interfaces
Photon Detection
Installation/Integration
|
25 Apr 2020 |
7009-v2 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to DP TPC Electronics |
Dario Autiero et al. |
TPC Dual-Phase
Electronics
IPR Oct 2019
Interfaces
WBS
Installation/Integration
|
25 Apr 2020 |
6853-v0 |
TDR Version - DUNE FD Interface Document: Installation to DUNE Software and Computing |
Eric James et al. |
IPR Oct 2019
Software and Computing
Interfaces
WBS
Installation/Integration
|
25 Apr 2020 |
6847-v1 |
TDR Version - DUNE FD Interface Document: Installation to Calibration Task Force |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
Interfaces
WBS
Installation/Integration
|
25 Apr 2020 |
7015-v2 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to Joint DAQ |
Eric James et al. |
Project Management
IPR Oct 2019
DAQ
Interfaces
Installation/Integration
|
25 Apr 2020 |
6676-v1 |
TDR Version - DUNE FD Interface Document: SP APA to Joint DAQ |
Georgia Karagiorgi et al. |
IPR Oct 2019
APA
TPC Single-Phase
DAQ
Interfaces
WBS
|
25 Apr 2020 |
7012-v2 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to Joint HV |
Eric James et al. |
Project Management
IPR Oct 2019
Interfaces
Installation/Integration
HV
|
25 Apr 2020 |
6727-v3 |
TDR Version - DUNE FD Interface Document: SP Photon Detector to Joint DAQ |
Dominique Duchesneau et al. |
IPR Oct 2019
TPC Single-Phase
DAQ
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
7018-v2 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to Joint CISC |
Sowjanya Gollapinni et al. |
Project Management
IPR Oct 2019
Interfaces
CISC
Installation/Integration
|
25 Apr 2020 |
6742-v7 |
TDR Version - DUNE FD Interface Document: SP TPC Electronics to joint DAQ |
David Christian et al. |
Electronics
IPR Oct 2019
TPC Single-Phase
DAQ
Interfaces
WBS
|
25 Apr 2020 |
7075-v0 |
TDR Version - DUNE FD Interface Document: DUNE Physics to SP APA |
Alberto Marchionni et al. |
IPR Oct 2019
TPC Single-Phase
Interfaces
Physics
WBS
|
25 Apr 2020 |
6757-v1 |
TDR Version - DUNE FD Interface Document: DP CRP to Joint DAQ |
Dominique Duchesneau et al. |
TPC Dual-Phase
IPR Oct 2019
CRP
DAQ
Interfaces
WBS
|
25 Apr 2020 |
7078-v0 |
TDR Version - DUNE FD Interface Document: DUNE Physics to SP Photon Detector |
Ryan Patterson et al. |
IPR Oct 2019
TPC Single-Phase
Interfaces
Physics
WBS
Photon Detection
|
25 Apr 2020 |
6802-v2 |
TDR Version - DUNE FD Interface Document: DP Photon Detector to Joint DAQ |
Burak Bilki et al. |
TPC Dual-Phase
IPR Oct 2019
DAQ
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
7081-v0 |
TDR Version - DUNE FD Interface Document: DUNE Physics to SP TPC Electronics |
David Christian et al. |
Electronics
IPR Oct 2019
TPC Single-Phase
Interfaces
Physics
WBS
|
25 Apr 2020 |
6778-v1 |
TDR Version - DUNE FD Interface Document: DP TPC Electronics to Joint DAQ |
Dario Autiero et al. |
TPC Dual-Phase
Electronics
IPR Oct 2019
DAQ
Interfaces
WBS
|
25 Apr 2020 |
7084-v0 |
TDR Version - DUNE FD Interface Document: DUNE Physics to DP CRP |
Dominique Duchesneau et al. |
TPC Dual-Phase
IPR Oct 2019
Interfaces
Physics
WBS
|
25 Apr 2020 |
7123-v1 |
TDR Version - DUNE FD Interface Document: Software and Computing to Joint DAQ |
Georgia Karagiorgi et al. |
IPR Oct 2019
DAQ
Software and Computing
Interfaces
WBS
|
25 Apr 2020 |
7087-v1 |
TDR Version - DUNE FD Interface Document: DUNE Physics to DP Photon Detector |
Dominique Duchesneau et al. |
TPC Dual-Phase
IPR Oct 2019
Interfaces
Physics
WBS
Photon Detection
|
25 Apr 2020 |
7069-v3 |
TDR Version - DUNE FD Interface Document: Calibration to Joint DAQ |
Giovanna Lehmann-Miotto |
IPR Oct 2019
Calibration
DAQ
Interfaces
WBS
|
25 Apr 2020 |
7090-v1 |
TDR Version - DUNE FD Interface Document: DUNE Physics to DP TPC Electronics |
Dario Autiero et al. |
TPC Dual-Phase
Electronics
IPR Oct 2019
Interfaces
Physics
WBS
|
25 Apr 2020 |
6673-v2 |
TDR Version - DUNE FD Interface Document: SP APA to joint High Voltage |
Alberto Marchionni et al. |
IPR Oct 2019
APA
TPC Single-Phase
Interfaces
WBS
HV
|
25 Apr 2020 |
6871-v0 |
TDR Version - DUNE FD Interface Document: DUNE Physics to DUNE Software and Computing |
Andrew Norman et al. |
IPR Oct 2019
Software and Computing
Interfaces
Physics
WBS
|
25 Apr 2020 |
6721-v3 |
TDR Version - DUNE FD Interface Document: SP Photon Detector to joint High Voltage |
Dominique Duchesneau et al. |
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
Photon Detection
HV
|
25 Apr 2020 |
6739-v5 |
TDR Version - DUNE FD Interface Document: SP TPC Electronics to Joint High Voltage |
David Christian et al. |
Electronics
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
HV
|
25 Apr 2020 |
6865-v0 |
TDR Version - DUNE FD Interface Document: Calibration Task Force to DUNE Physics |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
Interfaces
Physics
WBS
|
25 Apr 2020 |
6754-v2 |
TDR Version - DUNE FD Interface Document: DP CRP to Joint High Voltage |
Dominique Duchesneau et al. |
TPC Dual-Phase
IPR Oct 2019
CRP
Interfaces
WBS
HV
|
25 Apr 2020 |
7096-v0 |
TDR Version - DUNE FD Interface Document: DUNE Physics to Joint DAQ |
Georgia Karagiorgi et al. |
IPR Oct 2019
DAQ
Interfaces
Physics
WBS
|
25 Apr 2020 |
6799-v3 |
TDR Version - DUNE FD Interface Document: DP Photon Detector to Joint HV |
Burak Bilki et al. |
TPC Dual-Phase
IPR Oct 2019
Interfaces
WBS
Photon Detection
HV
|
25 Apr 2020 |
7093-v1 |
TDR Version - DUNE FD Interface Document: DUNE Physics to Joint HV |
Ryan Patterson et al. |
IPR Oct 2019
Interfaces
Physics
WBS
HV
|
25 Apr 2020 |
6775-v0 |
TDR Version - DUNE FD Interface Document: DP TPC Electronics to Joint High Voltage |
Dario Autiero et al. |
TPC Dual-Phase
Electronics
IPR Oct 2019
Interfaces
WBS
HV
|
25 Apr 2020 |
7099-v1 |
TDR Version - DUNE FD Interface Document: DUNE Physics to Joint CISC |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Interfaces
Physics
WBS
CISC
|
25 Apr 2020 |
7120-v1 |
TDR Version - DUNE FD Interface Document: Software and Computing to Joint HV |
Andrew Norman et al. |
IPR Oct 2019
Software and Computing
Interfaces
WBS
HV
|
25 Apr 2020 |
7066-v2 |
TDR Version - DUNE FD Interface Document: Calibration to Joint HV |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
Interfaces
WBS
HV
|
25 Apr 2020 |
6736-v1 |
TDR Version - DUNE FD Interface Document: High Voltage to DAQ |
Georgia Karagiorgi et al. |
IPR Oct 2019
DAQ
Interfaces
WBS
HV
|
25 Apr 2020 |
6679-v3 |
TDR Version - DUNE FD Interface Document for Single Phase/Joint: SP APA to Joint CISC |
Anselmo Cervera Villanueva et al. |
IPR Oct 2019
APA
TPC Single-Phase
Interfaces
WBS
CISC
|
25 Apr 2020 |
6730-v5 |
TDR Version - DUNE FD Interface Document: SP Photon Detector to Joint CISC |
Anselmo Cervera Villanueva et al. |
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
CISC
Photon Detection
|
25 Apr 2020 |
6745-v5 |
TDR Version - DUNE FD Interface Document: SP TPC Electronics to Joint CISC |
Anselmo Cervera Villanueva et al. |
Electronics
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
CISC
|
25 Apr 2020 |
6760-v1 |
TDR Version - DUNE FD Interface Document: DP CRP to Joint CISC |
Anselmo Cervera Villanueva et al. |
TPC Dual-Phase
IPR Oct 2019
CRP
Interfaces
WBS
CISC
|
25 Apr 2020 |
6781-v2 |
TDR Version - DUNE FD Interface Document: DP Photon Detector to Joint CISC |
Burak Bilki et al. |
TPC Dual-Phase
IPR Oct 2019
Interfaces
WBS
CISC
Photon Detection
|
25 Apr 2020 |
6784-v1 |
TDR Version - DUNE FD Interface Document: DP TPC Electronics to Joint CISC |
Dario Autiero et al. |
TPC Dual-Phase
Electronics
IPR Oct 2019
Interfaces
WBS
CISC
|
25 Apr 2020 |
7126-v4 |
TDR Version - DUNE FD Interface Document: Software and Computing to Joint CISC |
Anselmo Cervera Villanueva et al. |
IPR Oct 2019
Software and Computing
Interfaces
WBS
CISC
|
25 Apr 2020 |
7072-v2 |
TDR Version - DUNE FD Interface Document: Calibration to Joint CISC |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
Interfaces
WBS
CISC
|
25 Apr 2020 |
6790-v2 |
TDR Version - DUNE FD Interface Document: DAQ to CISC |
Anselmo Cervera Villanueva et al. |
IPR Oct 2019
DAQ
Interfaces
WBS
CISC
|
25 Apr 2020 |
6787-v3 |
TDR Version - DUNE FD Interface Document: High Voltage to CISC |
Anselmo Cervera Villanueva et al. |
IPR Oct 2019
Interfaces
WBS
CISC
HV
|
25 Apr 2020 |
6967-v1 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to SP APA |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
APA
TPC Single-Phase
Interfaces
WBS
Cryo Infrastructure
|
25 Apr 2020 |
6970-v1 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to SP Photon Detection |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
Photon Detection
Cryo Infrastructure
|
25 Apr 2020 |
6973-v5 |
TDR Version - DUNE FD Interface Document: Facility and Technical Coordination Interfaces to SP TPC Electronics |
David Christian et al. |
Far Site CF
Electronics
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
Cryo Infrastructure
|
25 Apr 2020 |
6979-v3 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to DP Photon Detector |
Dominique Duchesneau et al. |
TPC Dual-Phase
Far Site CF
IPR Oct 2019
Interfaces
WBS
Photon Detection
Cryo Infrastructure
|
25 Apr 2020 |
6982-v3 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to DP TPC Electronics |
Dario Autiero et al. |
TPC Dual-Phase
Far Site CF
Electronics
IPR Oct 2019
Interfaces
WBS
Cryo Infrastructure
|
25 Apr 2020 |
6841-v2 |
TDR Version - DUNE FD Interface Document: Facility to DUNE Software and Computing |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
Software and Computing
Interfaces
WBS
|
25 Apr 2020 |
6988-v3 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint DAQ |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
DAQ
Interfaces
WBS
Cryo Infrastructure
|
25 Apr 2020 |
6985-v1 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint HV |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
Interfaces
WBS
Cryo Infrastructure
HV
|
25 Apr 2020 |
6991-v2 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint CISC |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
Interfaces
WBS
CISC
Cryo Infrastructure
|
25 Apr 2020 |
10317-v6 |
Notes and Interface document between beamline and NSCF |
Tom Hamernik et al. |
IPR Oct 2019
Near Site CF
Beamline
Interfaces
|
10 Oct 2019 |
347-v1 |
[MIGRATED] Operation Feasibility, membrane cryostat, 50 mbarg design pressure |
Mark Adamowski |
ProtoDUNE
Director's
DOE
|
15 May 2019 |
183-v2 |
DUNE/LBNF CDR Volume 4: The DUNE Detectors at LBNF |
Maury Goodman et al. |
Near Detector
Far Detector
DOE CD-3a Review
Prototyping
Director's CD-3A Review of LBNF
Design Report
|
22 Sep 2016 |
181-v2 |
DUNE/LBNF CDR Volume 2: The Physics Program for DUNE at LBNF |
Mary Bishai et al. |
DOE CD-3a Review
Director's CD-3A Review of LBNF
Physics
Design Report
|
22 Sep 2016 |
278-v1 |
CDR Volume 1: The LBNE Project |
Mary Bishai |
Physics
Design Report
DOE
|
25 Jan 2016 |
158-v2 |
DUNE Far Detector 1 Parameters spreadsheet |
Russ Rucinski |
DOE CD-3a Review
Project Management
Director's CD-3A Review of LBNF
|
17 Nov 2015 |
598-v1 |
LBNF Far Site Conventional Facilities Preliminary Design Report (PDR) |
Tracy Lundin et al. |
Far Site CF
DOE CD-3a Review
Director's CD-3A Review of LBNF
Design Report
|
16 Nov 2015 |
599-v2 |
The Long-Baseline Neutrino Facility for DUNE: updated Volume 3 to CDR |
Elaine McCluskey |
Far Site CF
DOE CD-3a Review
Director's CD-3A Review of LBNF
Beamline
Design Report
Cryo Infrastructure
|
11 Nov 2015 |
339-v1 |
LBNE-India Detailed Project Report (DPR) submitted to DAE, India |
Sanjib Mishra et al. |
Near Detector
Electronics
Director's
Near Detector Physics
DOE
HV
|
04 Sep 2015 |