21630-v1 |
Letter to residents of Lead, SD, 18 Dec 2020 |
Patrick Weber |
Far Site CF
Communications
|
18 Dec 2020 |
122-v4 |
Environmental Assessment, FONSI, and Environmental Review Forms |
Rod Walton |
Far Site CF
NEPA
Near Site CF
IPR Jan 2021
May 2020 Directors Review
IPR Sep 2020 (EXC/BSI)
IPR Jul 2019
|
09 Dec 2020 |
328-v15 |
Far Site Shaft Hoisting Assumptions and Parameters |
Syd De Vries |
Far Site CF
DOE CD-3a Review
IPR Jul 2020
IPR Oct 2019
Director's CD-3A Review of LBNF
May 2020 Directors Review
Interfaces
IPR Sep 2020 (EXC/BSI)
|
03 Nov 2020 |
1869-v1 |
LBNF Overview for Cryo Operations Workshop |
Christopher Mossey |
Conventional Facilities
|
25 Oct 2016 |
112-v25 |
LBNF-DUNE Requirements except Cryostat Requirements |
Author Non-Collaborator |
Near Detector
Far Detector
Beamline
ES&H
Cryo Infrastructure
Conventional Facilities
Requirements
|
29 Jun 2020 |
3582-v4 |
Ross Cage Requirements for Design and Manufacture |
Emily Costopoulos et al. |
Far Site CF
Far Detector
Cryo Infrastructure
Requirements
|
29 Jun 2020 |
6829-v0 |
TDR Version - DUNE FD Interface Document: Facility to Calibration Task Force |
Farshid Feyzi et al. |
Education & Outreach
Far Site CF
IPR Oct 2019
Calibration
Interfaces
WBS
|
25 Apr 2020 |
6967-v1 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to SP APA |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
APA
TPC Single-Phase
Interfaces
WBS
Cryo Infrastructure
|
25 Apr 2020 |
6970-v1 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to SP Photon Detection |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
Photon Detection
Cryo Infrastructure
|
25 Apr 2020 |
6973-v5 |
TDR Version - DUNE FD Interface Document: Facility and Technical Coordination Interfaces to SP TPC Electronics |
David Christian et al. |
Far Site CF
Electronics
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
Cryo Infrastructure
|
25 Apr 2020 |
6979-v3 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to DP Photon Detector |
Dominique Duchesneau et al. |
TPC Dual-Phase
Far Site CF
IPR Oct 2019
Interfaces
WBS
Photon Detection
Cryo Infrastructure
|
25 Apr 2020 |
6982-v3 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to DP TPC Electronics |
Dario Autiero et al. |
TPC Dual-Phase
Far Site CF
Electronics
IPR Oct 2019
Interfaces
WBS
Cryo Infrastructure
|
25 Apr 2020 |
6841-v2 |
TDR Version - DUNE FD Interface Document: Facility to DUNE Software and Computing |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
Software and Computing
Interfaces
WBS
|
25 Apr 2020 |
6988-v3 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint DAQ |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
DAQ
Interfaces
WBS
Cryo Infrastructure
|
25 Apr 2020 |
6985-v1 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint HV |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
Interfaces
WBS
Cryo Infrastructure
HV
|
25 Apr 2020 |
6991-v2 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint CISC |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
Interfaces
WBS
CISC
Cryo Infrastructure
|
25 Apr 2020 |
10317-v6 |
Notes and Interface document between beamline and NSCF |
Tom Hamernik et al. |
IPR Oct 2019
Near Site CF
Beamline
Interfaces
|
10 Oct 2019 |
2152-v5 |
City of Lead Public Meeting Presentation March 2017, Oct 2017, April 2018 |
Josh Willhite |
Far Site CF
NEPA
Conventional Facilities
Pipe Conveyor Procurement
|
18 Jan 2019 |
11239-v2 |
LBNF - EXC 60% FD Submission_Drawings |
Joshua Yacknowitz |
Far Site CF
Conventional Facilities
|
05 Dec 2018 |
9613-v2 |
NCAB - Presentations |
Tracy Lundin |
Far Site CF
|
01 Aug 2018 |
8864-v1 |
NCAB - Background Supporting Documents |
Tracy Lundin |
Far Site CF
|
28 Jun 2018 |
5519-v1 |
Status of LBNF beamline |
Tristan Davenne |
Primary Beamline
Communications
Conventional Facilities
|
27 Sep 2017 |
5045-v1 |
Interface Meeting Presentations - August 23, 2017 - Lundin |
Tracy Lundin |
Far Site CF
Systems Engineering
|
23 Aug 2017 |
2139-v1 |
Supporting Environmental Documentation |
Rod Walton |
Far Site CF
NEPA
Near Site CF
|
07 Aug 2017 |
182-v1 |
(OLD) LBNF/DUNE CDR Volume 3: The Long-Baseline Neutrino Facility for DUNE |
Tom Hamernik et al. |
Beamline
Design Report
Cryo Infrastructure
Conventional Facilities
|
24 Jan 2017 |
972-v1 |
Far Site Waste Rock Handling Options - August 2014 |
Syd De Vries |
Far Site CF
|
27 Jan 2016 |
598-v1 |
LBNF Far Site Conventional Facilities Preliminary Design Report (PDR) |
Tracy Lundin et al. |
Far Site CF
DOE CD-3a Review
Director's CD-3A Review of LBNF
Design Report
|
16 Nov 2015 |
599-v2 |
The Long-Baseline Neutrino Facility for DUNE: updated Volume 3 to CDR |
Elaine McCluskey |
Far Site CF
DOE CD-3a Review
Director's CD-3A Review of LBNF
Beamline
Design Report
Cryo Infrastructure
|
11 Nov 2015 |
314-v1 |
LBNF/DUNE CDR Annex 3C: Conventional Facilities (CF) at the Far Site |
Tracy Lundin et al. |
Far Site CF
Director's CD-3A Review of LBNF
Design Report
|
12 Oct 2015 |
319-v1 |
LBNF/DUNE CDR Annex 3B, Conventional Facilities (CF) at the Near Site |
Tom Hamernik et al. |
Near Site CF
Design Report
|
23 Sep 2015 |
275-v1 |
Report on the Depth Requirements for a Massive Detector at Homestake |
Milind Diwan |
Physics
Conventional Facilities
Requirements
|
02 Sep 2015 |
205-v3 |
LBNF Kicker Capacitor Specification |
Luciano Elementi |
Procurement
Primary Beamline
Near Site CF
Budget
Requirements
Internal
|
31 Aug 2015 |
150-v1 |
FSCF Requirements and Interface Review Charge |
James Strait |
Far Site CF
Internal
|
28 Aug 2015 |
135-v1 |
Talks during pre-risk workshop prep meetings Aug 2015 |
Author Non-LBNF et al. |
Far Site CF
Risk Management
|
27 Aug 2015 |
86-v0 |
LBNF Beamline Interface Definition 89 |
Dave Pushka |
Near Site CF
Neutrino Beamline
|
21 Aug 2015 |
37-v1 |
FEMB Noise vs Wire Maps on APAs |
Alan A Hahn |
TPC Single-Phase
Conventional Facilities
|
31 Jul 2015 |