8921-v1 |
Lessons Learned Guideline |
Kevin Fahey |
Quality Assurance
Lessons Learned
|
05 Feb 2021 |
82-v10 |
OBSOLETE: LBNF/DUNE Configuration Management Plan |
Jack Fowler et al. |
Director's Oct 2018 Cost/Schedule Review
Systems Engineering
IPR Oct 2019
Change Control
IPR Jan 2021
May 2020 Directors Review
IPR Jul 2019
|
09 Dec 2020 |
328-v15 |
Far Site Shaft Hoisting Assumptions and Parameters |
Syd De Vries |
Far Site CF
DOE CD-3a Review
IPR Jul 2020
IPR Oct 2019
Director's CD-3A Review of LBNF
May 2020 Directors Review
Interfaces
IPR Sep 2020 (EXC/BSI)
|
03 Nov 2020 |
1651-v3 |
ProtoDUNE-SP Timing System: Interfaces and Protocol |
Dave Newbold |
ProtoDUNE
DAQ
Interfaces
|
13 Aug 2020 |
3126-v5 |
ProtoDUNE ANL Photon Detector Readout PRR Documents |
John T. Anderson et al. |
ProtoDUNE
Quality Assurance
Photon Detection
|
13 Aug 2020 |
6443-v3 |
DUNE FD Risks |
Eric James et al. |
Far Detector
Project Management
Electronics
Purity/Cleanliness/Radiation
APA
DAQ
Risk Management
Photon Detection
Installation/Integration
HV
|
07 Jul 2020 |
112-v25 |
LBNF-DUNE Requirements except Cryostat Requirements |
Author Non-Collaborator |
Near Detector
Far Detector
Beamline
ES&H
Cryo Infrastructure
Conventional Facilities
Requirements
|
29 Jun 2020 |
3582-v4 |
Ross Cage Requirements for Design and Manufacture |
Emily Costopoulos et al. |
Far Site CF
Far Detector
Cryo Infrastructure
Requirements
|
29 Jun 2020 |
6670-v5 |
TDR Version - DUNE FD Interface Document : SP APA to SP TPC Electronics |
David Christian et al. |
Electronics
IPR Oct 2019
APA
TPC Single-Phase
Interfaces
WBS
|
29 Jun 2020 |
11233-v1 |
DUNE Far Detector Timing and Synchronization System |
David G Cussans et al. |
TPC Dual-Phase
Electronics
Calibration
TPC Single-Phase
DAQ
Interfaces
CISC
Photon Detection
Installation/Integration
|
03 May 2020 |
7192-v6 |
DUNE FD Risks: CISC |
Anselmo Cervera Villanueva et al. |
Project Management
Risk Management
CISC
|
03 May 2020 |
16766-v0 |
Interface Control Document - SP HV to Detector Support |
Francesco Pietropaolo |
Interfaces
HV
|
25 Apr 2020 |
11224-v2 |
DUNE FD Interface Document: Timing/Synchronization |
David G Cussans et al. |
TPC Dual-Phase
Electronics
Calibration
TPC Single-Phase
DAQ
Interfaces
CISC
Photon Detection
|
25 Apr 2020 |
7045-v1 |
DUNE FD Interface Document: Integration Facility to Joint CISC |
Sowjanya Gollapinni et al. |
Project Management
Interfaces
CISC
Installation/Integration
|
25 Apr 2020 |
7039-v1 |
DUNE FD Interface Document: Integration Facility to Joint HV |
Eric James et al. |
Interfaces
WBS
Installation/Integration
HV
|
25 Apr 2020 |
7021-v2 |
DUNE FD Interface Document: Integration Facility to SP APA |
Eric James et al. |
Project Management
APA
TPC Single-Phase
Interfaces
Installation/Integration
|
25 Apr 2020 |
6667-v3 |
TDR Version - DUNE FD Interface Document: SP APA to SP Photon Detector |
Alberto Marchionni et al. |
IPR Oct 2019
APA
TPC Single-Phase
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
6718-v5 |
TDR Version - DUNE FD Interface Document: SP Photon Detector to SP TPC Electronics |
David Christian et al. |
Electronics
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
7102-v1 |
TDR Version - DUNE FD Interface Document: Software and Computing to SP APA |
Alberto Marchionni et al. |
IPR Oct 2019
APA
Software and Computing
Interfaces
WBS
|
25 Apr 2020 |
7105-v1 |
TDR Version - DUNE FD Interface Document: Software and Computing to SP Photon Detector |
Andrew Norman et al. |
IPR Oct 2019
TPC Single-Phase
Software and Computing
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
7108-v1 |
TDR Version - DUNE FD Interface Document: Software and Computing to SP TPC Electronics |
Marco Verzocchi |
Electronics
IPR Oct 2019
TPC Single-Phase
Software and Computing
Interfaces
WBS
|
25 Apr 2020 |
7048-v1 |
TDR Version - DUNE FD Interface Document: Calibration to SP APA |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
APA
TPC Single-Phase
Interfaces
WBS
|
25 Apr 2020 |
7051-v2 |
TDR Version - DUNE FD Interface Document: Calibration to SP Photon Detector |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
TPC Single-Phase
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
7054-v1 |
TDR Version - DUNE FD Interface Document: Calibration to SP TPC Electronics |
David Christian et al. |
Electronics
IPR Oct 2019
Calibration
TPC Single-Phase
Interfaces
WBS
|
25 Apr 2020 |
7060-v2 |
TDR Version - DUNE FD Interface Document: Calibration to DP Photon Detector |
Burak Bilki et al. |
TPC Dual-Phase
IPR Oct 2019
Calibration
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
7063-v1 |
TDR Version - DUNE FD Interface Document: Calibration to DP TPC Electronics |
Dario Autiero et al. |
TPC Dual-Phase
Electronics
IPR Oct 2019
Calibration
Interfaces
WBS
|
25 Apr 2020 |
6868-v1 |
TDR Version - DUNE FD Interface Document: Calibration Task Force to DUNE Software and Computing |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
Software and Computing
Interfaces
WBS
|
25 Apr 2020 |
6829-v0 |
TDR Version - DUNE FD Interface Document: Facility to Calibration Task Force |
Farshid Feyzi et al. |
Education & Outreach
Far Site CF
IPR Oct 2019
Calibration
Interfaces
WBS
|
25 Apr 2020 |
6994-v3 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to SP APA |
Eric James et al. |
Project Management
IPR Oct 2019
APA
TPC Single-Phase
Interfaces
Installation/Integration
|
25 Apr 2020 |
6997-v1 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to SP Photon Detector |
Eric James et al. |
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
Photon Detection
Installation/Integration
|
25 Apr 2020 |
7000-v2 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to SP TPC Electronics |
David Christian et al. |
Project Management
Electronics
IPR Oct 2019
TPC Single-Phase
Interfaces
Installation/Integration
|
25 Apr 2020 |
7003-v1 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to DP CRP |
Dominique Duchesneau et al. |
TPC Dual-Phase
IPR Oct 2019
CRP
Interfaces
WBS
Installation/Integration
|
25 Apr 2020 |
7006-v3 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to DP Photon Detector |
Dominique Duchesneau et al. |
TPC Dual-Phase
Project Management
IPR Oct 2019
Interfaces
Photon Detection
Installation/Integration
|
25 Apr 2020 |
7009-v2 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to DP TPC Electronics |
Dario Autiero et al. |
TPC Dual-Phase
Electronics
IPR Oct 2019
Interfaces
WBS
Installation/Integration
|
25 Apr 2020 |
6853-v0 |
TDR Version - DUNE FD Interface Document: Installation to DUNE Software and Computing |
Eric James et al. |
IPR Oct 2019
Software and Computing
Interfaces
WBS
Installation/Integration
|
25 Apr 2020 |
6847-v1 |
TDR Version - DUNE FD Interface Document: Installation to Calibration Task Force |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
Interfaces
WBS
Installation/Integration
|
25 Apr 2020 |
7015-v2 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to Joint DAQ |
Eric James et al. |
Project Management
IPR Oct 2019
DAQ
Interfaces
Installation/Integration
|
25 Apr 2020 |
6676-v1 |
TDR Version - DUNE FD Interface Document: SP APA to Joint DAQ |
Georgia Karagiorgi et al. |
IPR Oct 2019
APA
TPC Single-Phase
DAQ
Interfaces
WBS
|
25 Apr 2020 |
7012-v2 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to Joint HV |
Eric James et al. |
Project Management
IPR Oct 2019
Interfaces
Installation/Integration
HV
|
25 Apr 2020 |
6727-v3 |
TDR Version - DUNE FD Interface Document: SP Photon Detector to Joint DAQ |
Dominique Duchesneau et al. |
IPR Oct 2019
TPC Single-Phase
DAQ
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
7018-v2 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to Joint CISC |
Sowjanya Gollapinni et al. |
Project Management
IPR Oct 2019
Interfaces
CISC
Installation/Integration
|
25 Apr 2020 |
6742-v7 |
TDR Version - DUNE FD Interface Document: SP TPC Electronics to joint DAQ |
David Christian et al. |
Electronics
IPR Oct 2019
TPC Single-Phase
DAQ
Interfaces
WBS
|
25 Apr 2020 |
7075-v0 |
TDR Version - DUNE FD Interface Document: DUNE Physics to SP APA |
Alberto Marchionni et al. |
IPR Oct 2019
TPC Single-Phase
Interfaces
Physics
WBS
|
25 Apr 2020 |
6757-v1 |
TDR Version - DUNE FD Interface Document: DP CRP to Joint DAQ |
Dominique Duchesneau et al. |
TPC Dual-Phase
IPR Oct 2019
CRP
DAQ
Interfaces
WBS
|
25 Apr 2020 |
7078-v0 |
TDR Version - DUNE FD Interface Document: DUNE Physics to SP Photon Detector |
Ryan Patterson et al. |
IPR Oct 2019
TPC Single-Phase
Interfaces
Physics
WBS
Photon Detection
|
25 Apr 2020 |
6802-v2 |
TDR Version - DUNE FD Interface Document: DP Photon Detector to Joint DAQ |
Burak Bilki et al. |
TPC Dual-Phase
IPR Oct 2019
DAQ
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
7081-v0 |
TDR Version - DUNE FD Interface Document: DUNE Physics to SP TPC Electronics |
David Christian et al. |
Electronics
IPR Oct 2019
TPC Single-Phase
Interfaces
Physics
WBS
|
25 Apr 2020 |
6778-v1 |
TDR Version - DUNE FD Interface Document: DP TPC Electronics to Joint DAQ |
Dario Autiero et al. |
TPC Dual-Phase
Electronics
IPR Oct 2019
DAQ
Interfaces
WBS
|
25 Apr 2020 |
7084-v0 |
TDR Version - DUNE FD Interface Document: DUNE Physics to DP CRP |
Dominique Duchesneau et al. |
TPC Dual-Phase
IPR Oct 2019
Interfaces
Physics
WBS
|
25 Apr 2020 |
7123-v1 |
TDR Version - DUNE FD Interface Document: Software and Computing to Joint DAQ |
Georgia Karagiorgi et al. |
IPR Oct 2019
DAQ
Software and Computing
Interfaces
WBS
|
25 Apr 2020 |
7087-v1 |
TDR Version - DUNE FD Interface Document: DUNE Physics to DP Photon Detector |
Dominique Duchesneau et al. |
TPC Dual-Phase
IPR Oct 2019
Interfaces
Physics
WBS
Photon Detection
|
25 Apr 2020 |
7069-v3 |
TDR Version - DUNE FD Interface Document: Calibration to Joint DAQ |
Giovanna Lehmann-Miotto |
IPR Oct 2019
Calibration
DAQ
Interfaces
WBS
|
25 Apr 2020 |
7090-v1 |
TDR Version - DUNE FD Interface Document: DUNE Physics to DP TPC Electronics |
Dario Autiero et al. |
TPC Dual-Phase
Electronics
IPR Oct 2019
Interfaces
Physics
WBS
|
25 Apr 2020 |
6673-v2 |
TDR Version - DUNE FD Interface Document: SP APA to joint High Voltage |
Alberto Marchionni et al. |
IPR Oct 2019
APA
TPC Single-Phase
Interfaces
WBS
HV
|
25 Apr 2020 |
6871-v0 |
TDR Version - DUNE FD Interface Document: DUNE Physics to DUNE Software and Computing |
Andrew Norman et al. |
IPR Oct 2019
Software and Computing
Interfaces
Physics
WBS
|
25 Apr 2020 |
6721-v3 |
TDR Version - DUNE FD Interface Document: SP Photon Detector to joint High Voltage |
Dominique Duchesneau et al. |
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
Photon Detection
HV
|
25 Apr 2020 |
6739-v5 |
TDR Version - DUNE FD Interface Document: SP TPC Electronics to Joint High Voltage |
David Christian et al. |
Electronics
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
HV
|
25 Apr 2020 |
6865-v0 |
TDR Version - DUNE FD Interface Document: Calibration Task Force to DUNE Physics |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
Interfaces
Physics
WBS
|
25 Apr 2020 |
6754-v2 |
TDR Version - DUNE FD Interface Document: DP CRP to Joint High Voltage |
Dominique Duchesneau et al. |
TPC Dual-Phase
IPR Oct 2019
CRP
Interfaces
WBS
HV
|
25 Apr 2020 |
7096-v0 |
TDR Version - DUNE FD Interface Document: DUNE Physics to Joint DAQ |
Georgia Karagiorgi et al. |
IPR Oct 2019
DAQ
Interfaces
Physics
WBS
|
25 Apr 2020 |
6799-v3 |
TDR Version - DUNE FD Interface Document: DP Photon Detector to Joint HV |
Burak Bilki et al. |
TPC Dual-Phase
IPR Oct 2019
Interfaces
WBS
Photon Detection
HV
|
25 Apr 2020 |
7093-v1 |
TDR Version - DUNE FD Interface Document: DUNE Physics to Joint HV |
Ryan Patterson et al. |
IPR Oct 2019
Interfaces
Physics
WBS
HV
|
25 Apr 2020 |
6775-v0 |
TDR Version - DUNE FD Interface Document: DP TPC Electronics to Joint High Voltage |
Dario Autiero et al. |
TPC Dual-Phase
Electronics
IPR Oct 2019
Interfaces
WBS
HV
|
25 Apr 2020 |
7099-v1 |
TDR Version - DUNE FD Interface Document: DUNE Physics to Joint CISC |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Interfaces
Physics
WBS
CISC
|
25 Apr 2020 |
7120-v1 |
TDR Version - DUNE FD Interface Document: Software and Computing to Joint HV |
Andrew Norman et al. |
IPR Oct 2019
Software and Computing
Interfaces
WBS
HV
|
25 Apr 2020 |
7066-v2 |
TDR Version - DUNE FD Interface Document: Calibration to Joint HV |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
Interfaces
WBS
HV
|
25 Apr 2020 |
6736-v1 |
TDR Version - DUNE FD Interface Document: High Voltage to DAQ |
Georgia Karagiorgi et al. |
IPR Oct 2019
DAQ
Interfaces
WBS
HV
|
25 Apr 2020 |
6679-v3 |
TDR Version - DUNE FD Interface Document for Single Phase/Joint: SP APA to Joint CISC |
Anselmo Cervera Villanueva et al. |
IPR Oct 2019
APA
TPC Single-Phase
Interfaces
WBS
CISC
|
25 Apr 2020 |
6730-v5 |
TDR Version - DUNE FD Interface Document: SP Photon Detector to Joint CISC |
Anselmo Cervera Villanueva et al. |
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
CISC
Photon Detection
|
25 Apr 2020 |
6745-v5 |
TDR Version - DUNE FD Interface Document: SP TPC Electronics to Joint CISC |
Anselmo Cervera Villanueva et al. |
Electronics
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
CISC
|
25 Apr 2020 |
6760-v1 |
TDR Version - DUNE FD Interface Document: DP CRP to Joint CISC |
Anselmo Cervera Villanueva et al. |
TPC Dual-Phase
IPR Oct 2019
CRP
Interfaces
WBS
CISC
|
25 Apr 2020 |
6781-v2 |
TDR Version - DUNE FD Interface Document: DP Photon Detector to Joint CISC |
Burak Bilki et al. |
TPC Dual-Phase
IPR Oct 2019
Interfaces
WBS
CISC
Photon Detection
|
25 Apr 2020 |
6784-v1 |
TDR Version - DUNE FD Interface Document: DP TPC Electronics to Joint CISC |
Dario Autiero et al. |
TPC Dual-Phase
Electronics
IPR Oct 2019
Interfaces
WBS
CISC
|
25 Apr 2020 |
7126-v4 |
TDR Version - DUNE FD Interface Document: Software and Computing to Joint CISC |
Anselmo Cervera Villanueva et al. |
IPR Oct 2019
Software and Computing
Interfaces
WBS
CISC
|
25 Apr 2020 |
7072-v2 |
TDR Version - DUNE FD Interface Document: Calibration to Joint CISC |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
Interfaces
WBS
CISC
|
25 Apr 2020 |
6790-v2 |
TDR Version - DUNE FD Interface Document: DAQ to CISC |
Anselmo Cervera Villanueva et al. |
IPR Oct 2019
DAQ
Interfaces
WBS
CISC
|
25 Apr 2020 |
6787-v3 |
TDR Version - DUNE FD Interface Document: High Voltage to CISC |
Anselmo Cervera Villanueva et al. |
IPR Oct 2019
Interfaces
WBS
CISC
HV
|
25 Apr 2020 |
6967-v1 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to SP APA |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
APA
TPC Single-Phase
Interfaces
WBS
Cryo Infrastructure
|
25 Apr 2020 |
6970-v1 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to SP Photon Detection |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
Photon Detection
Cryo Infrastructure
|
25 Apr 2020 |
6973-v5 |
TDR Version - DUNE FD Interface Document: Facility and Technical Coordination Interfaces to SP TPC Electronics |
David Christian et al. |
Far Site CF
Electronics
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
Cryo Infrastructure
|
25 Apr 2020 |
6979-v3 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to DP Photon Detector |
Dominique Duchesneau et al. |
TPC Dual-Phase
Far Site CF
IPR Oct 2019
Interfaces
WBS
Photon Detection
Cryo Infrastructure
|
25 Apr 2020 |
6982-v3 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to DP TPC Electronics |
Dario Autiero et al. |
TPC Dual-Phase
Far Site CF
Electronics
IPR Oct 2019
Interfaces
WBS
Cryo Infrastructure
|
25 Apr 2020 |
6841-v2 |
TDR Version - DUNE FD Interface Document: Facility to DUNE Software and Computing |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
Software and Computing
Interfaces
WBS
|
25 Apr 2020 |
6988-v3 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint DAQ |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
DAQ
Interfaces
WBS
Cryo Infrastructure
|
25 Apr 2020 |
6985-v1 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint HV |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
Interfaces
WBS
Cryo Infrastructure
HV
|
25 Apr 2020 |
6991-v2 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint CISC |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
Interfaces
WBS
CISC
Cryo Infrastructure
|
25 Apr 2020 |
10317-v6 |
Notes and Interface document between beamline and NSCF |
Tom Hamernik et al. |
IPR Oct 2019
Near Site CF
Beamline
Interfaces
|
10 Oct 2019 |
7626-v2 |
LBNF/DUNE Requirements Management Plan |
Nandhini Dhanaraj et al. |
Systems Engineering
Project Management
Requirements
|
27 Sep 2018 |
11179-v2 |
LBNF Requirements Review Template Comments Document |
Nandhini Dhanaraj |
Requirements
|
30 Oct 2018 |
5252-v1 |
Teamcenter Requirements Management evaluation |
Anne Heavey |
Requirements
|
11 May 2018 |
3009-v2 |
ProtoDUNE UTA DP Field Cage PRR Documents |
Kevin Fahey |
ProtoDUNE
Quality Assurance
Internal
|
02 Mar 2018 |
6212-v1 |
Risk Workshop Intro - Dec 2017 |
Elaine McCluskey |
Risk Management
|
01 Dec 2017 |
5054-v1 |
Cryostat construction to detector installation transition |
Jim Stewart |
Far Detector
Interfaces
|
23 Aug 2017 |
5078-v1 |
LBNF/Dune SP Mezzanine Interface |
Jack Fowler |
Systems Engineering
Cryo Infrastructure
Installation/Integration
|
23 Aug 2017 |
5045-v1 |
Interface Meeting Presentations - August 23, 2017 - Lundin |
Tracy Lundin |
Far Site CF
Systems Engineering
|
23 Aug 2017 |
275-v1 |
Report on the Depth Requirements for a Massive Detector at Homestake |
Milind Diwan |
Physics
Conventional Facilities
Requirements
|
02 Sep 2015 |
205-v3 |
LBNF Kicker Capacitor Specification |
Luciano Elementi |
Procurement
Primary Beamline
Near Site CF
Budget
Requirements
Internal
|
31 Aug 2015 |
116-v1 |
Risk Schedule 08-2015 |
Anne Heavey |
Risk Management
|
30 Aug 2015 |
135-v1 |
Talks during pre-risk workshop prep meetings Aug 2015 |
Author Non-LBNF et al. |
Far Site CF
Risk Management
|
27 Aug 2015 |