1315-v1 |
35ton Lessons Learned Compilation |
Michelle Stancari |
TPC Single-Phase
35t Prototype
|
27 May 2016 |
8255-v2 |
ProtoDUNE - SP Lessons Learned |
Regina Rameika |
IPR Jul 2020
ProtoDUNE
IPR Oct 2019
May 2020 Directors Review
Lessons Learned
|
05 Feb 2021 |
8921-v1 |
Lessons Learned Guideline |
Kevin Fahey |
Quality Assurance
Lessons Learned
|
05 Feb 2021 |
12367-v2 |
Lessons learned from ProtoDUNE, details for the SP-CE consortium |
Marco Verzocchi |
IPR Jul 2020
IPR Oct 2019
TPC Single-Phase
May 2020 Directors Review
Lessons Learned
|
05 Feb 2021 |
44-v65 |
LBNF Overall Org Charts |
Elaine McCluskey |
DOE CD-3a Review
Director's CD-3A Review of LBNF
IPR Jan 2021
Org/Staffing
|
26 Jan 2021 |
21763-v1 |
Joint Project Office Org Chart |
Elaine McCluskey |
Org/Staffing
|
08 Jan 2021 |
2115-v23 |
LBNF/DUNE Other Schedule Reports for Reviews |
None |
None
|
30 Aug 2020 |
42-v33 |
DUNE Org Charts |
Maxine Hronek |
IPR Oct 2019
IPR Jan 2021
Org/Staffing
DUNE Collaboration
|
09 Dec 2020 |
1766-v2 |
CD-3a Approve Initial Far Site Construction for LBNF/DUNE (Sep 2016) & CD-3a Revision (Oct 2020) |
Author Non-Collaborator |
Project Management
|
03 Dec 2020 |
716-v1 |
Critical Decision 1 Approval for LBNF/DUNE |
Author Non-Collaborator |
DOE CD-3a Review
IPR Jul 2020
Project Management
IPR Sep 2020 (EXC/BSI)
|
24 Aug 2020 |
142-v1 |
LBNE CD-0 Mission Need Statement |
Author Non-LBNF |
DOE CD-3a Review
IPR Jul 2020
Project Management
Director's CD-3A Review of LBNF
IPR Sep 2020 (EXC/BSI)
|
24 Aug 2020 |
5609-v15 |
DUNE FD WBS: Slow Control |
Anselmo Cervera Villanueva et al. |
Far Detector
Project Management
|
13 Aug 2020 |
6443-v3 |
DUNE FD Risks |
Eric James et al. |
Far Detector
Project Management
Electronics
Purity/Cleanliness/Radiation
APA
DAQ
Risk Management
Photon Detection
Installation/Integration
HV
|
07 Jul 2020 |
6670-v5 |
TDR Version - DUNE FD Interface Document : SP APA to SP TPC Electronics |
David Christian et al. |
Electronics
IPR Oct 2019
APA
TPC Single-Phase
Interfaces
WBS
|
29 Jun 2020 |
12751-v2 |
Computing Consortium Governance Document |
Heidi Schellman |
Project Management
Software and Computing
DUNE Collaboration
|
17 Jun 2020 |
8426-v2 |
DUNE Load List for Ross |
Jim Stewart |
Far Detector
Logistics
|
03 May 2020 |
7192-v6 |
DUNE FD Risks: CISC |
Anselmo Cervera Villanueva et al. |
Project Management
Risk Management
CISC
|
03 May 2020 |
7045-v1 |
DUNE FD Interface Document: Integration Facility to Joint CISC |
Sowjanya Gollapinni et al. |
Project Management
Interfaces
CISC
Installation/Integration
|
25 Apr 2020 |
7039-v1 |
DUNE FD Interface Document: Integration Facility to Joint HV |
Eric James et al. |
Interfaces
WBS
Installation/Integration
HV
|
25 Apr 2020 |
7021-v2 |
DUNE FD Interface Document: Integration Facility to SP APA |
Eric James et al. |
Project Management
APA
TPC Single-Phase
Interfaces
Installation/Integration
|
25 Apr 2020 |
6667-v3 |
TDR Version - DUNE FD Interface Document: SP APA to SP Photon Detector |
Alberto Marchionni et al. |
IPR Oct 2019
APA
TPC Single-Phase
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
6718-v5 |
TDR Version - DUNE FD Interface Document: SP Photon Detector to SP TPC Electronics |
David Christian et al. |
Electronics
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
7102-v1 |
TDR Version - DUNE FD Interface Document: Software and Computing to SP APA |
Alberto Marchionni et al. |
IPR Oct 2019
APA
Software and Computing
Interfaces
WBS
|
25 Apr 2020 |
7105-v1 |
TDR Version - DUNE FD Interface Document: Software and Computing to SP Photon Detector |
Andrew Norman et al. |
IPR Oct 2019
TPC Single-Phase
Software and Computing
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
7108-v1 |
TDR Version - DUNE FD Interface Document: Software and Computing to SP TPC Electronics |
Marco Verzocchi |
Electronics
IPR Oct 2019
TPC Single-Phase
Software and Computing
Interfaces
WBS
|
25 Apr 2020 |
7048-v1 |
TDR Version - DUNE FD Interface Document: Calibration to SP APA |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
APA
TPC Single-Phase
Interfaces
WBS
|
25 Apr 2020 |
7051-v2 |
TDR Version - DUNE FD Interface Document: Calibration to SP Photon Detector |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
TPC Single-Phase
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
7054-v1 |
TDR Version - DUNE FD Interface Document: Calibration to SP TPC Electronics |
David Christian et al. |
Electronics
IPR Oct 2019
Calibration
TPC Single-Phase
Interfaces
WBS
|
25 Apr 2020 |
7060-v2 |
TDR Version - DUNE FD Interface Document: Calibration to DP Photon Detector |
Burak Bilki et al. |
TPC Dual-Phase
IPR Oct 2019
Calibration
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
7063-v1 |
TDR Version - DUNE FD Interface Document: Calibration to DP TPC Electronics |
Dario Autiero et al. |
TPC Dual-Phase
Electronics
IPR Oct 2019
Calibration
Interfaces
WBS
|
25 Apr 2020 |
6868-v1 |
TDR Version - DUNE FD Interface Document: Calibration Task Force to DUNE Software and Computing |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
Software and Computing
Interfaces
WBS
|
25 Apr 2020 |
6829-v0 |
TDR Version - DUNE FD Interface Document: Facility to Calibration Task Force |
Farshid Feyzi et al. |
Education & Outreach
Far Site CF
IPR Oct 2019
Calibration
Interfaces
WBS
|
25 Apr 2020 |
6994-v3 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to SP APA |
Eric James et al. |
Project Management
IPR Oct 2019
APA
TPC Single-Phase
Interfaces
Installation/Integration
|
25 Apr 2020 |
6997-v1 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to SP Photon Detector |
Eric James et al. |
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
Photon Detection
Installation/Integration
|
25 Apr 2020 |
7000-v2 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to SP TPC Electronics |
David Christian et al. |
Project Management
Electronics
IPR Oct 2019
TPC Single-Phase
Interfaces
Installation/Integration
|
25 Apr 2020 |
7003-v1 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to DP CRP |
Dominique Duchesneau et al. |
TPC Dual-Phase
IPR Oct 2019
CRP
Interfaces
WBS
Installation/Integration
|
25 Apr 2020 |
7006-v3 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to DP Photon Detector |
Dominique Duchesneau et al. |
TPC Dual-Phase
Project Management
IPR Oct 2019
Interfaces
Photon Detection
Installation/Integration
|
25 Apr 2020 |
7009-v2 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to DP TPC Electronics |
Dario Autiero et al. |
TPC Dual-Phase
Electronics
IPR Oct 2019
Interfaces
WBS
Installation/Integration
|
25 Apr 2020 |
6853-v0 |
TDR Version - DUNE FD Interface Document: Installation to DUNE Software and Computing |
Eric James et al. |
IPR Oct 2019
Software and Computing
Interfaces
WBS
Installation/Integration
|
25 Apr 2020 |
6847-v1 |
TDR Version - DUNE FD Interface Document: Installation to Calibration Task Force |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
Interfaces
WBS
Installation/Integration
|
25 Apr 2020 |
7015-v2 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to Joint DAQ |
Eric James et al. |
Project Management
IPR Oct 2019
DAQ
Interfaces
Installation/Integration
|
25 Apr 2020 |
6676-v1 |
TDR Version - DUNE FD Interface Document: SP APA to Joint DAQ |
Georgia Karagiorgi et al. |
IPR Oct 2019
APA
TPC Single-Phase
DAQ
Interfaces
WBS
|
25 Apr 2020 |
7012-v2 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to Joint HV |
Eric James et al. |
Project Management
IPR Oct 2019
Interfaces
Installation/Integration
HV
|
25 Apr 2020 |
6727-v3 |
TDR Version - DUNE FD Interface Document: SP Photon Detector to Joint DAQ |
Dominique Duchesneau et al. |
IPR Oct 2019
TPC Single-Phase
DAQ
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
7018-v2 |
TDR Version - DUNE FD Interface Document: Installation Interfaces to Joint CISC |
Sowjanya Gollapinni et al. |
Project Management
IPR Oct 2019
Interfaces
CISC
Installation/Integration
|
25 Apr 2020 |
6742-v7 |
TDR Version - DUNE FD Interface Document: SP TPC Electronics to joint DAQ |
David Christian et al. |
Electronics
IPR Oct 2019
TPC Single-Phase
DAQ
Interfaces
WBS
|
25 Apr 2020 |
7075-v0 |
TDR Version - DUNE FD Interface Document: DUNE Physics to SP APA |
Alberto Marchionni et al. |
IPR Oct 2019
TPC Single-Phase
Interfaces
Physics
WBS
|
25 Apr 2020 |
6757-v1 |
TDR Version - DUNE FD Interface Document: DP CRP to Joint DAQ |
Dominique Duchesneau et al. |
TPC Dual-Phase
IPR Oct 2019
CRP
DAQ
Interfaces
WBS
|
25 Apr 2020 |
7078-v0 |
TDR Version - DUNE FD Interface Document: DUNE Physics to SP Photon Detector |
Ryan Patterson et al. |
IPR Oct 2019
TPC Single-Phase
Interfaces
Physics
WBS
Photon Detection
|
25 Apr 2020 |
6802-v2 |
TDR Version - DUNE FD Interface Document: DP Photon Detector to Joint DAQ |
Burak Bilki et al. |
TPC Dual-Phase
IPR Oct 2019
DAQ
Interfaces
WBS
Photon Detection
|
25 Apr 2020 |
7081-v0 |
TDR Version - DUNE FD Interface Document: DUNE Physics to SP TPC Electronics |
David Christian et al. |
Electronics
IPR Oct 2019
TPC Single-Phase
Interfaces
Physics
WBS
|
25 Apr 2020 |
6778-v1 |
TDR Version - DUNE FD Interface Document: DP TPC Electronics to Joint DAQ |
Dario Autiero et al. |
TPC Dual-Phase
Electronics
IPR Oct 2019
DAQ
Interfaces
WBS
|
25 Apr 2020 |
7084-v0 |
TDR Version - DUNE FD Interface Document: DUNE Physics to DP CRP |
Dominique Duchesneau et al. |
TPC Dual-Phase
IPR Oct 2019
Interfaces
Physics
WBS
|
25 Apr 2020 |
7123-v1 |
TDR Version - DUNE FD Interface Document: Software and Computing to Joint DAQ |
Georgia Karagiorgi et al. |
IPR Oct 2019
DAQ
Software and Computing
Interfaces
WBS
|
25 Apr 2020 |
7087-v1 |
TDR Version - DUNE FD Interface Document: DUNE Physics to DP Photon Detector |
Dominique Duchesneau et al. |
TPC Dual-Phase
IPR Oct 2019
Interfaces
Physics
WBS
Photon Detection
|
25 Apr 2020 |
7069-v3 |
TDR Version - DUNE FD Interface Document: Calibration to Joint DAQ |
Giovanna Lehmann-Miotto |
IPR Oct 2019
Calibration
DAQ
Interfaces
WBS
|
25 Apr 2020 |
7090-v1 |
TDR Version - DUNE FD Interface Document: DUNE Physics to DP TPC Electronics |
Dario Autiero et al. |
TPC Dual-Phase
Electronics
IPR Oct 2019
Interfaces
Physics
WBS
|
25 Apr 2020 |
6673-v2 |
TDR Version - DUNE FD Interface Document: SP APA to joint High Voltage |
Alberto Marchionni et al. |
IPR Oct 2019
APA
TPC Single-Phase
Interfaces
WBS
HV
|
25 Apr 2020 |
6871-v0 |
TDR Version - DUNE FD Interface Document: DUNE Physics to DUNE Software and Computing |
Andrew Norman et al. |
IPR Oct 2019
Software and Computing
Interfaces
Physics
WBS
|
25 Apr 2020 |
6721-v3 |
TDR Version - DUNE FD Interface Document: SP Photon Detector to joint High Voltage |
Dominique Duchesneau et al. |
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
Photon Detection
HV
|
25 Apr 2020 |
6739-v5 |
TDR Version - DUNE FD Interface Document: SP TPC Electronics to Joint High Voltage |
David Christian et al. |
Electronics
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
HV
|
25 Apr 2020 |
6865-v0 |
TDR Version - DUNE FD Interface Document: Calibration Task Force to DUNE Physics |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
Interfaces
Physics
WBS
|
25 Apr 2020 |
6754-v2 |
TDR Version - DUNE FD Interface Document: DP CRP to Joint High Voltage |
Dominique Duchesneau et al. |
TPC Dual-Phase
IPR Oct 2019
CRP
Interfaces
WBS
HV
|
25 Apr 2020 |
7096-v0 |
TDR Version - DUNE FD Interface Document: DUNE Physics to Joint DAQ |
Georgia Karagiorgi et al. |
IPR Oct 2019
DAQ
Interfaces
Physics
WBS
|
25 Apr 2020 |
6799-v3 |
TDR Version - DUNE FD Interface Document: DP Photon Detector to Joint HV |
Burak Bilki et al. |
TPC Dual-Phase
IPR Oct 2019
Interfaces
WBS
Photon Detection
HV
|
25 Apr 2020 |
7093-v1 |
TDR Version - DUNE FD Interface Document: DUNE Physics to Joint HV |
Ryan Patterson et al. |
IPR Oct 2019
Interfaces
Physics
WBS
HV
|
25 Apr 2020 |
6775-v0 |
TDR Version - DUNE FD Interface Document: DP TPC Electronics to Joint High Voltage |
Dario Autiero et al. |
TPC Dual-Phase
Electronics
IPR Oct 2019
Interfaces
WBS
HV
|
25 Apr 2020 |
7099-v1 |
TDR Version - DUNE FD Interface Document: DUNE Physics to Joint CISC |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Interfaces
Physics
WBS
CISC
|
25 Apr 2020 |
7120-v1 |
TDR Version - DUNE FD Interface Document: Software and Computing to Joint HV |
Andrew Norman et al. |
IPR Oct 2019
Software and Computing
Interfaces
WBS
HV
|
25 Apr 2020 |
7066-v2 |
TDR Version - DUNE FD Interface Document: Calibration to Joint HV |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
Interfaces
WBS
HV
|
25 Apr 2020 |
6736-v1 |
TDR Version - DUNE FD Interface Document: High Voltage to DAQ |
Georgia Karagiorgi et al. |
IPR Oct 2019
DAQ
Interfaces
WBS
HV
|
25 Apr 2020 |
6679-v3 |
TDR Version - DUNE FD Interface Document for Single Phase/Joint: SP APA to Joint CISC |
Anselmo Cervera Villanueva et al. |
IPR Oct 2019
APA
TPC Single-Phase
Interfaces
WBS
CISC
|
25 Apr 2020 |
6730-v5 |
TDR Version - DUNE FD Interface Document: SP Photon Detector to Joint CISC |
Anselmo Cervera Villanueva et al. |
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
CISC
Photon Detection
|
25 Apr 2020 |
6745-v5 |
TDR Version - DUNE FD Interface Document: SP TPC Electronics to Joint CISC |
Anselmo Cervera Villanueva et al. |
Electronics
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
CISC
|
25 Apr 2020 |
6760-v1 |
TDR Version - DUNE FD Interface Document: DP CRP to Joint CISC |
Anselmo Cervera Villanueva et al. |
TPC Dual-Phase
IPR Oct 2019
CRP
Interfaces
WBS
CISC
|
25 Apr 2020 |
6781-v2 |
TDR Version - DUNE FD Interface Document: DP Photon Detector to Joint CISC |
Burak Bilki et al. |
TPC Dual-Phase
IPR Oct 2019
Interfaces
WBS
CISC
Photon Detection
|
25 Apr 2020 |
6784-v1 |
TDR Version - DUNE FD Interface Document: DP TPC Electronics to Joint CISC |
Dario Autiero et al. |
TPC Dual-Phase
Electronics
IPR Oct 2019
Interfaces
WBS
CISC
|
25 Apr 2020 |
7126-v4 |
TDR Version - DUNE FD Interface Document: Software and Computing to Joint CISC |
Anselmo Cervera Villanueva et al. |
IPR Oct 2019
Software and Computing
Interfaces
WBS
CISC
|
25 Apr 2020 |
7072-v2 |
TDR Version - DUNE FD Interface Document: Calibration to Joint CISC |
Sowjanya Gollapinni et al. |
IPR Oct 2019
Calibration
Interfaces
WBS
CISC
|
25 Apr 2020 |
6790-v2 |
TDR Version - DUNE FD Interface Document: DAQ to CISC |
Anselmo Cervera Villanueva et al. |
IPR Oct 2019
DAQ
Interfaces
WBS
CISC
|
25 Apr 2020 |
6787-v3 |
TDR Version - DUNE FD Interface Document: High Voltage to CISC |
Anselmo Cervera Villanueva et al. |
IPR Oct 2019
Interfaces
WBS
CISC
HV
|
25 Apr 2020 |
6967-v1 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to SP APA |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
APA
TPC Single-Phase
Interfaces
WBS
Cryo Infrastructure
|
25 Apr 2020 |
6970-v1 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to SP Photon Detection |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
Photon Detection
Cryo Infrastructure
|
25 Apr 2020 |
6973-v5 |
TDR Version - DUNE FD Interface Document: Facility and Technical Coordination Interfaces to SP TPC Electronics |
David Christian et al. |
Far Site CF
Electronics
IPR Oct 2019
TPC Single-Phase
Interfaces
WBS
Cryo Infrastructure
|
25 Apr 2020 |
6979-v3 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to DP Photon Detector |
Dominique Duchesneau et al. |
TPC Dual-Phase
Far Site CF
IPR Oct 2019
Interfaces
WBS
Photon Detection
Cryo Infrastructure
|
25 Apr 2020 |
6982-v3 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to DP TPC Electronics |
Dario Autiero et al. |
TPC Dual-Phase
Far Site CF
Electronics
IPR Oct 2019
Interfaces
WBS
Cryo Infrastructure
|
25 Apr 2020 |
6841-v2 |
TDR Version - DUNE FD Interface Document: Facility to DUNE Software and Computing |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
Software and Computing
Interfaces
WBS
|
25 Apr 2020 |
6988-v3 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint DAQ |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
DAQ
Interfaces
WBS
Cryo Infrastructure
|
25 Apr 2020 |
6985-v1 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint HV |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
Interfaces
WBS
Cryo Infrastructure
HV
|
25 Apr 2020 |
6991-v2 |
TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint CISC |
Farshid Feyzi et al. |
Far Site CF
IPR Oct 2019
Interfaces
WBS
CISC
Cryo Infrastructure
|
25 Apr 2020 |
987-v16 |
LBNF Org Chart: Project Team with Line Management; Names included |
Elaine McCluskey |
Org/Staffing
|
11 Sep 2019 |
7626-v2 |
LBNF/DUNE Requirements Management Plan |
Nandhini Dhanaraj et al. |
Systems Engineering
Project Management
Requirements
|
27 Sep 2018 |
13223-v1 |
RFI for LBNF FSCF EXC |
Troy Lark |
Procurement
|
13 Mar 2019 |
8507-v1 |
Logistics Industry Day talks, 31 May 2018 |
Mike J Headley et al. |
Logistics
|
18 Jan 2019 |
960-v2 |
DOE-CERN Protocol Agreements |
Author Non-LBNF |
MOU
|
05 May 2017 |
770-v1 |
MA 607915 - FSCF Project Management |
Sandra Efstathiou |
Procurement
|
18 Nov 2015 |
597-v1 |
DUNE/LBNF CDR Volume 1: The LBNF and DUNE Projects (updated Intro to CDR) |
Mary Bishai et al. |
Project Management
Director's CD-3A Review of LBNF
Design Report
DUNE Collaboration
|
24 Jan 2017 |
180-v1 |
(OLD) DUNE/LBNF CDR Volume 1: The LBNF and DUNE Projects |
Mary Bishai et al. |
Project Management
Director's CD-3A Review of LBNF
Design Report
DUNE Collaboration
|
24 Jan 2017 |
1343-v1 |
LBNF CM/GC Far Site Facilities RFP and Sample Subcontract |
Greg Wray |
Procurement
|
08 Jun 2016 |
158-v2 |
DUNE Far Detector 1 Parameters spreadsheet |
Russ Rucinski |
DOE CD-3a Review
Project Management
Director's CD-3A Review of LBNF
|
17 Nov 2015 |
143-v1 |
LBNE CD-1 Approve Alternative Selection and Cost Range |
Author Non-LBNF |
Project Management
Director's CD-3A Review of LBNF
|
16 Nov 2015 |
523-v1 |
CD-3a Director's Review agenda, charge, committee |
Author Non-LBNF |
Project Management
Director's
|
02 Oct 2015 |
487-v1 |
LBNF/DUNE Overview for UMN |
Elaine McCluskey |
Project Management
|
28 Sep 2015 |
425-v1 |
Excerpt from Mission Need Statement for a Long Baseline Neutrino Experiment |
Author Non-Collaborator |
Project Management
|
11 Sep 2015 |
205-v3 |
LBNF Kicker Capacitor Specification |
Luciano Elementi |
Procurement
Primary Beamline
Near Site CF
Budget
Requirements
Internal
|
31 Aug 2015 |