Document Database (DocDB) for DUNE and LBNF


DocDB Home ]  [ Search ] [ Last 20 Days ] [ List/Add Authors ] [ Events ] [ DUNE Help ] [ Topics ]

These documents for dunepm are available:

DUNE-doc-# Title Author(s) Topic(s) Last Updated
42-v33 DUNE Org Charts Maxine Hronek DUNE Collaboration
Org/Staffing
IPR Oct 2019
23 Nov 2020
1869-v1 LBNF Overview for Cryo Operations Workshop Christopher Mossey Conventional Facilities
25 Oct 2016
4499-v13 OBSOLETE - Detector Racks - DUNE working document Theresa Shaw Far Detector
Installation/Integration
20 Oct 2020
2115-v23 LBNF/DUNE Other Schedule Reports for Reviews None None
30 Aug 2020
3126-v5 ProtoDUNE ANL Photon Detector Readout PRR Documents John T. Anderson et al. Photon Detection
ProtoDUNE
Quality Assurance
13 Aug 2020
2096-v2 LBNF Target Chase Nitrogen Fill & Purge System Initial Design Dave Pushka Mechanical
Beamline
20 Apr 2017
12367-v2 Lessons learned from ProtoDUNE, details for the SP-CE consortium Marco Verzocchi IPR Jul 2020
IPR Oct 2019
May 2020 Directors Review
TPC Single-Phase
30 Jun 2020
112-v25 LBNF-DUNE Requirements except Cryostat Requirements Author Non-Collaborator Far Detector
Cryo Infrastructure
Near Detector
Beamline
Requirements
ES&H
Conventional Facilities
29 Jun 2020
1794-v10 Single-Phase ProtoDUNE Technical Design Report Flavio Cavanna et al. ProtoDUNE
Design Report
May 2020 Directors Review
06 May 2020
6967-v1 TDR Version - DUNE FD Interface Document: Facility Interfaces to SP APA Farshid Feyzi et al. Far Site CF
WBS
IPR Oct 2019
Cryo Infrastructure
Interfaces
TPC Single-Phase
APA
25 Apr 2020
6970-v1 TDR Version - DUNE FD Interface Document: Facility Interfaces to SP Photon Detection Farshid Feyzi et al. Far Site CF
WBS
Photon Detection
IPR Oct 2019
Cryo Infrastructure
Interfaces
TPC Single-Phase
25 Apr 2020
6973-v5 TDR Version - DUNE FD Interface Document: Facility and Technical Coordination Interfaces to SP TPC Electronics David Christian et al. Electronics
Far Site CF
WBS
IPR Oct 2019
Cryo Infrastructure
Interfaces
TPC Single-Phase
25 Apr 2020
6979-v3 TDR Version - DUNE FD Interface Document: Facility Interfaces to DP Photon Detector Dominique Duchesneau et al. Far Site CF
WBS
Photon Detection
IPR Oct 2019
Cryo Infrastructure
Interfaces
TPC Dual-Phase
25 Apr 2020
6982-v3 TDR Version - DUNE FD Interface Document: Facility Interfaces to DP TPC Electronics Dario Autiero et al. Electronics
Far Site CF
WBS
IPR Oct 2019
Cryo Infrastructure
Interfaces
TPC Dual-Phase
25 Apr 2020
6841-v2 TDR Version - DUNE FD Interface Document: Facility to DUNE Software and Computing Farshid Feyzi et al. Far Site CF
WBS
IPR Oct 2019
Interfaces
Software and Computing
25 Apr 2020
6988-v3 TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint DAQ Farshid Feyzi et al. Far Site CF
DAQ
WBS
IPR Oct 2019
Cryo Infrastructure
Interfaces
25 Apr 2020
6985-v1 TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint HV Farshid Feyzi et al. Far Site CF
WBS
IPR Oct 2019
HV
Cryo Infrastructure
Interfaces
25 Apr 2020
6991-v2 TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint CISC Farshid Feyzi et al. Far Site CF
WBS
IPR Oct 2019
CISC
Cryo Infrastructure
Interfaces
25 Apr 2020
44-v62 LBNF Overall Org Charts Elaine McCluskey Org/Staffing
Director's CD-3A Review of LBNF
DOE CD-3a Review
15 Oct 2019
519-v2 LBNF Cryostat Condensation Prevention Simulation Erik A Voirin Cryostat
Director's CD-3A Review of LBNF
06 Nov 2017
7626-v2 LBNF/DUNE Requirements Management Plan Nandhini Dhanaraj et al. Project Management
Systems Engineering
Requirements
27 Sep 2018

Number of documents found: 21

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List/Add Authors ] [ Events ] [ DUNE Help ] [ Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact Service Desk



DocDB Version 8.8.10, contact Document Database Administrators
Execution time: 27 wallclock secs ( 3.85 usr + 1.78 sys = 5.63 CPU)