Document Database (DocDB) for DUNE and LBNF


DocDB Home ]  [ Search ] [ Last 20 Days ] [ List/Add Authors ] [ Events ] [ DUNE Help ] [ Topics ]

Theresa Shaw of Fermilab is listed as an author on the most recent version of the following documents:
See documents with Theresa Shaw on any version.

DUNE-doc-# Title Author(s) Topic(s) Last Updated
4499-v12 Detector Racks - DUNE working document Theresa Shaw Far Detector
Installation/Integration
17 Aug 2020
6829-v0 TDR Version - DUNE FD Interface Document: Facility to Calibration Task Force Farshid Feyzi et al. Far Site CF
WBS
IPR Oct 2019
Interfaces
Education & Outreach
Calibration
25 Apr 2020
6967-v1 TDR Version - DUNE FD Interface Document: Facility Interfaces to SP APA Farshid Feyzi et al. Far Site CF
WBS
IPR Oct 2019
Cryo Infrastructure
Interfaces
TPC Single-Phase
APA
25 Apr 2020
6970-v1 TDR Version - DUNE FD Interface Document: Facility Interfaces to SP Photon Detection Farshid Feyzi et al. Far Site CF
WBS
Photon Detection
IPR Oct 2019
Cryo Infrastructure
Interfaces
TPC Single-Phase
25 Apr 2020
6973-v5 TDR Version - DUNE FD Interface Document: Facility and Technical Coordination Interfaces to SP TPC Electronics David Christian et al. Electronics
Far Site CF
WBS
IPR Oct 2019
Cryo Infrastructure
Interfaces
TPC Single-Phase
25 Apr 2020
6979-v3 TDR Version - DUNE FD Interface Document: Facility Interfaces to DP Photon Detector Dominique Duchesneau et al. Far Site CF
WBS
Photon Detection
IPR Oct 2019
Cryo Infrastructure
Interfaces
TPC Dual-Phase
25 Apr 2020
6982-v3 TDR Version - DUNE FD Interface Document: Facility Interfaces to DP TPC Electronics Dario Autiero et al. Electronics
Far Site CF
WBS
IPR Oct 2019
Cryo Infrastructure
Interfaces
TPC Dual-Phase
25 Apr 2020
6841-v2 TDR Version - DUNE FD Interface Document: Facility to DUNE Software and Computing Farshid Feyzi et al. Far Site CF
WBS
IPR Oct 2019
Interfaces
Software and Computing
25 Apr 2020
6988-v3 TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint DAQ Farshid Feyzi et al. Far Site CF
DAQ
WBS
IPR Oct 2019
Cryo Infrastructure
Interfaces
25 Apr 2020
6985-v1 TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint HV Farshid Feyzi et al. Far Site CF
WBS
IPR Oct 2019
HV
Cryo Infrastructure
Interfaces
25 Apr 2020
6991-v2 TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint CISC Farshid Feyzi et al. Far Site CF
WBS
IPR Oct 2019
CISC
Cryo Infrastructure
Interfaces
25 Apr 2020

Number of documents found: 11

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List/Add Authors ] [ Events ] [ DUNE Help ] [ Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact Service Desk



DocDB Version 8.8.9, contact Document Database Administrators
Execution time: 2 wallclock secs ( 0.38 usr + 0.10 sys = 0.48 CPU)