Document Database (DocDB) for DUNE and LBNF


DocDB Home ]  [ Search ] [ Last 20 Days ] [ List/Add Authors ] [ Events ] [ DUNE Help ] [ Topics ]

DUNE-doc-# Title Author(s) Topic(s) Last Updated
662-v2 How to use DUNE's DocDB Eileen F Berman et al. Collaborative Tools
18 May 2020
1794-v10 Single-Phase ProtoDUNE Technical Design Report Flavio Cavanna et al. ProtoDUNE
Design Report
May 2020 Directors Review
06 May 2020
12367-v2 Lessons learned from ProtoDUNE, details for the SP-CE consortium Marco Verzocchi IPR Oct 2019
May 2020 Directors Review
TPC Single-Phase
06 May 2020
8255-v2 ProtoDUNE - SP Lessons Learned Regina Rameika ProtoDUNE
IPR Oct 2019
May 2020 Directors Review
06 May 2020
2096-v2 LBNF Target Chase Nitrogen Fill & Purge System Initial Design Dave Pushka Mechanical
Beamline
20 Apr 2017
122-v4 Environmental Assessment, FONSI, and Environmental Review Forms Rod Walton IPR Jul 2019
Near Site CF
NEPA
Far Site CF
May 2020 Directors Review
04 May 2020
602-v3 The LBNF Cryogenics Infrastructure at the Far Site Min Jeong Kim et al. Design Report
Director's CD-3A Review of LBNF
DOE CD-3a Review
IPR Oct 2019
Cryo Infrastructure
May 2020 Directors Review
04 May 2020
15544-v1 DUNE FD SP DAQ rack layout and power consumption estimate draft Giovanna Lehmann-Miotto et al. DAQ
03 May 2020
14938-v1 DAQ Consortium Working Group Mandates Giovanna Lehmann-Miotto et al. DAQ
03 May 2020
14522-v1 Supernovae triggering (likelihood approach) Pierre JJ Lasorak DAQ
03 May 2020
14095-v1 ProtoDUNE DAQ Schedule 2019 Giovanna Lehmann-Miotto DAQ
DAQ
03 May 2020
14068-v7 Fitting supernova spectral parameters with the Deep Underground Neutrino Experiment Erin Conley Physics
Supernova Neutrinos
03 May 2020
14062-v1 ProtoDUNE Data Selection Tests Joshua R Klein Prototyping
Physics
Far Detector
03 May 2020
11311-v2 ML-based data selection for DUNE far detector Guanqun Ge et al. Design Report
DUNE Collaboration
DAQ
Supernova Neutrinos
Far Detector
03 May 2020
11275-v1 Dune Data Selection Summary Alexander Booth et al. DAQ
Far Detector
03 May 2020
11236-v2 Single phase TPC trigger primitive algorithms for TDR Philip Rodrigues DAQ
03 May 2020
11233-v1 DUNE Far Detector Timing and Synchronization System David G Cussans et al. Photon Detection
Interfaces
Installation/Integration
Calibration
Electronics
DAQ
CISC
TPC Dual-Phase
TPC Single-Phase
03 May 2020
11215-v3 Data Selection for DUNE Beam and Atmospheric Events David Last et al. Far Detector
03 May 2020
11098-v4 The protoDUNE Single Phase Detector Control System Antoine Kehrli et al. HV
ProtoDUNE
Detector Performance
Installation/Integration
On-site Assembly and Installation
Field Cage
Electronics
TPC Single Phase
03 May 2020
9240-v4 DUNE Far Detector Data Volumes Joshua R Klein Far Detector
03 May 2020
8426-v2 DUNE Load List for Ross Jim Stewart Logistics
Far Detector
03 May 2020
7192-v6 DUNE FD Risks: CISC Anselmo Cervera Villanueva et al. Risk Management
Project Management
CISC
03 May 2020
6260-v22 DUNE Installation Integration Victor Guarino Installation/Integration
27 Apr 2020
16766-v0 Interface Control Document - SP HV to Detector Support Francesco Pietropaolo Interfaces
HV
25 Apr 2020
11224-v2 DUNE FD Interface Document: Timing/Synchronization David G Cussans et al. Photon Detection
Interfaces
Calibration
Electronics
DAQ
CISC
TPC Dual-Phase
TPC Single-Phase
25 Apr 2020
7045-v1 DUNE FD Interface Document: Integration Facility to Joint CISC Sowjanya Gollapinni et al. Interfaces
Installation/Integration
Project Management
CISC
25 Apr 2020
7039-v1 DUNE FD Interface Document: Integration Facility to Joint HV Eric James et al. WBS
Interfaces
Installation/Integration
HV
25 Apr 2020
7021-v2 DUNE FD Interface Document: Integration Facility to SP APA Eric James et al. Interfaces
Installation/Integration
Project Management
TPC Single-Phase
APA
25 Apr 2020
6667-v3 TDR Version - DUNE FD Interface Document: SP APA to SP Photon Detector Alberto Marchionni et al. WBS
Photon Detection
IPR Oct 2019
Interfaces
TPC Single-Phase
APA
25 Apr 2020
6718-v5 TDR Version - DUNE FD Interface Document: SP Photon Detector to SP TPC Electronics David Christian et al. WBS
Photon Detection
IPR Oct 2019
Interfaces
Electronics
TPC Single-Phase
25 Apr 2020
7102-v1 TDR Version - DUNE FD Interface Document: Software and Computing to SP APA Alberto Marchionni et al. WBS
IPR Oct 2019
Interfaces
Software and Computing
APA
25 Apr 2020
7105-v1 TDR Version - DUNE FD Interface Document: Software and Computing to SP Photon Detector Andrew Norman et al. WBS
Photon Detection
IPR Oct 2019
Interfaces
Software and Computing
TPC Single-Phase
25 Apr 2020
7108-v1 TDR Version - DUNE FD Interface Document: Software and Computing to SP TPC Electronics Marco Verzocchi WBS
IPR Oct 2019
Interfaces
Electronics
Software and Computing
TPC Single-Phase
25 Apr 2020
7048-v1 TDR Version - DUNE FD Interface Document: Calibration to SP APA Sowjanya Gollapinni et al. WBS
IPR Oct 2019
Interfaces
Calibration
TPC Single-Phase
APA
25 Apr 2020
7051-v2 TDR Version - DUNE FD Interface Document: Calibration to SP Photon Detector Sowjanya Gollapinni et al. WBS
Photon Detection
IPR Oct 2019
Interfaces
Calibration
TPC Single-Phase
25 Apr 2020
7054-v1 TDR Version - DUNE FD Interface Document: Calibration to SP TPC Electronics David Christian et al. WBS
IPR Oct 2019
Interfaces
Calibration
Electronics
TPC Single-Phase
25 Apr 2020
7060-v2 TDR Version - DUNE FD Interface Document: Calibration to DP Photon Detector Burak Bilki et al. WBS
Photon Detection
IPR Oct 2019
Interfaces
Calibration
TPC Dual-Phase
25 Apr 2020
7063-v1 TDR Version - DUNE FD Interface Document: Calibration to DP TPC Electronics Dario Autiero et al. WBS
IPR Oct 2019
Interfaces
Calibration
Electronics
TPC Dual-Phase
25 Apr 2020
6868-v1 TDR Version - DUNE FD Interface Document: Calibration Task Force to DUNE Software and Computing Sowjanya Gollapinni et al. WBS
IPR Oct 2019
Interfaces
Calibration
Software and Computing
25 Apr 2020
6829-v0 TDR Version - DUNE FD Interface Document: Facility to Calibration Task Force Farshid Feyzi et al. Far Site CF
WBS
IPR Oct 2019
Interfaces
Education & Outreach
Calibration
25 Apr 2020
6994-v3 TDR Version - DUNE FD Interface Document: Installation Interfaces to SP APA Eric James et al. IPR Oct 2019
Interfaces
Installation/Integration
Project Management
TPC Single-Phase
APA
25 Apr 2020
6997-v1 TDR Version - DUNE FD Interface Document: Installation Interfaces to SP Photon Detector Eric James et al. WBS
Photon Detection
IPR Oct 2019
Interfaces
Installation/Integration
TPC Single-Phase
25 Apr 2020
7000-v2 TDR Version - DUNE FD Interface Document: Installation Interfaces to SP TPC Electronics David Christian et al. IPR Oct 2019
Interfaces
Installation/Integration
Electronics
Project Management
TPC Single-Phase
25 Apr 2020
7003-v1 TDR Version - DUNE FD Interface Document: Installation Interfaces to DP CRP Dominique Duchesneau et al. WBS
IPR Oct 2019
Interfaces
Installation/Integration
CRP
TPC Dual-Phase
25 Apr 2020
7006-v3 TDR Version - DUNE FD Interface Document: Installation Interfaces to DP Photon Detector Dominique Duchesneau et al. Photon Detection
IPR Oct 2019
Interfaces
Installation/Integration
Project Management
TPC Dual-Phase
25 Apr 2020
7009-v2 TDR Version - DUNE FD Interface Document: Installation Interfaces to DP TPC Electronics Dario Autiero et al. WBS
IPR Oct 2019
Interfaces
Installation/Integration
Electronics
TPC Dual-Phase
25 Apr 2020
6853-v0 TDR Version - DUNE FD Interface Document: Installation to DUNE Software and Computing Eric James et al. WBS
IPR Oct 2019
Interfaces
Installation/Integration
Software and Computing
25 Apr 2020
6847-v1 TDR Version - DUNE FD Interface Document: Installation to Calibration Task Force Sowjanya Gollapinni et al. WBS
IPR Oct 2019
Interfaces
Installation/Integration
Calibration
25 Apr 2020
7015-v2 TDR Version - DUNE FD Interface Document: Installation Interfaces to Joint DAQ Eric James et al. IPR Oct 2019
Interfaces
Installation/Integration
DAQ
Project Management
25 Apr 2020
6676-v1 TDR Version - DUNE FD Interface Document: SP APA to Joint DAQ Georgia Karagiorgi et al. WBS
IPR Oct 2019
Interfaces
DAQ
TPC Single-Phase
APA
25 Apr 2020
7012-v2 TDR Version - DUNE FD Interface Document: Installation Interfaces to Joint HV Eric James et al. IPR Oct 2019
Interfaces
Installation/Integration
Project Management
HV
25 Apr 2020
6727-v3 TDR Version - DUNE FD Interface Document: SP Photon Detector to Joint DAQ Dominique Duchesneau et al. WBS
Photon Detection
IPR Oct 2019
Interfaces
DAQ
TPC Single-Phase
25 Apr 2020
7018-v2 TDR Version - DUNE FD Interface Document: Installation Interfaces to Joint CISC Sowjanya Gollapinni et al. IPR Oct 2019
Interfaces
Installation/Integration
Project Management
CISC
25 Apr 2020
6742-v7 TDR Version - DUNE FD Interface Document: SP TPC Electronics to joint DAQ David Christian et al. WBS
IPR Oct 2019
Interfaces
Electronics
DAQ
TPC Single-Phase
25 Apr 2020
7075-v0 TDR Version - DUNE FD Interface Document: DUNE Physics to SP APA Alberto Marchionni et al. Physics
WBS
IPR Oct 2019
Interfaces
TPC Single-Phase
25 Apr 2020
6757-v1 TDR Version - DUNE FD Interface Document: DP CRP to Joint DAQ Dominique Duchesneau et al. WBS
IPR Oct 2019
Interfaces
CRP
DAQ
TPC Dual-Phase
25 Apr 2020
7078-v0 TDR Version - DUNE FD Interface Document: DUNE Physics to SP Photon Detector Ryan Patterson et al. Physics
WBS
Photon Detection
IPR Oct 2019
Interfaces
TPC Single-Phase
25 Apr 2020
6802-v2 TDR Version - DUNE FD Interface Document: DP Photon Detector to Joint DAQ Burak Bilki et al. WBS
Photon Detection
IPR Oct 2019
Interfaces
DAQ
TPC Dual-Phase
25 Apr 2020
7081-v0 TDR Version - DUNE FD Interface Document: DUNE Physics to SP TPC Electronics David Christian et al. Physics
WBS
IPR Oct 2019
Interfaces
Electronics
TPC Single-Phase
25 Apr 2020
6778-v1 TDR Version - DUNE FD Interface Document: DP TPC Electronics to Joint DAQ Dario Autiero et al. WBS
IPR Oct 2019
Interfaces
Electronics
DAQ
TPC Dual-Phase
25 Apr 2020
7084-v0 TDR Version - DUNE FD Interface Document: DUNE Physics to DP CRP Dominique Duchesneau et al. Physics
WBS
IPR Oct 2019
Interfaces
TPC Dual-Phase
25 Apr 2020
7123-v1 TDR Version - DUNE FD Interface Document: Software and Computing to Joint DAQ Georgia Karagiorgi et al. WBS
IPR Oct 2019
Interfaces
DAQ
Software and Computing
25 Apr 2020
7087-v1 TDR Version - DUNE FD Interface Document: DUNE Physics to DP Photon Detector Dominique Duchesneau et al. Physics
WBS
Photon Detection
IPR Oct 2019
Interfaces
TPC Dual-Phase
25 Apr 2020
7069-v3 TDR Version - DUNE FD Interface Document: Calibration to Joint DAQ Giovanna Lehmann-Miotto WBS
IPR Oct 2019
Interfaces
Calibration
DAQ
25 Apr 2020
7090-v1 TDR Version - DUNE FD Interface Document: DUNE Physics to DP TPC Electronics Dario Autiero et al. Physics
WBS
IPR Oct 2019
Interfaces
Electronics
TPC Dual-Phase
25 Apr 2020
6673-v2 TDR Version - DUNE FD Interface Document: SP APA to joint High Voltage Alberto Marchionni et al. WBS
IPR Oct 2019
Interfaces
HV
TPC Single-Phase
APA
25 Apr 2020
6871-v0 TDR Version - DUNE FD Interface Document: DUNE Physics to DUNE Software and Computing Andrew Norman et al. Physics
WBS
IPR Oct 2019
Interfaces
Software and Computing
25 Apr 2020
6721-v3 TDR Version - DUNE FD Interface Document: SP Photon Detector to joint High Voltage Dominique Duchesneau et al. WBS
Photon Detection
IPR Oct 2019
Interfaces
HV
TPC Single-Phase
25 Apr 2020
6739-v5 TDR Version - DUNE FD Interface Document: SP TPC Electronics to Joint High Voltage David Christian et al. WBS
IPR Oct 2019
Interfaces
Electronics
HV
TPC Single-Phase
25 Apr 2020
6865-v0 TDR Version - DUNE FD Interface Document: Calibration Task Force to DUNE Physics Sowjanya Gollapinni et al. Physics
WBS
IPR Oct 2019
Interfaces
Calibration
25 Apr 2020
6754-v2 TDR Version - DUNE FD Interface Document: DP CRP to Joint High Voltage Dominique Duchesneau et al. WBS
IPR Oct 2019
Interfaces
CRP
HV
TPC Dual-Phase
25 Apr 2020
7096-v0 TDR Version - DUNE FD Interface Document: DUNE Physics to Joint DAQ Georgia Karagiorgi et al. Physics
WBS
IPR Oct 2019
Interfaces
DAQ
25 Apr 2020
6799-v3 TDR Version - DUNE FD Interface Document: DP Photon Detector to Joint HV Burak Bilki et al. WBS
Photon Detection
IPR Oct 2019
Interfaces
HV
TPC Dual-Phase
25 Apr 2020
7093-v1 TDR Version - DUNE FD Interface Document: DUNE Physics to Joint HV Ryan Patterson et al. Physics
WBS
IPR Oct 2019
Interfaces
HV
25 Apr 2020
6775-v0 TDR Version - DUNE FD Interface Document: DP TPC Electronics to Joint High Voltage Dario Autiero et al. WBS
IPR Oct 2019
Interfaces
Electronics
HV
TPC Dual-Phase
25 Apr 2020
7099-v1 TDR Version - DUNE FD Interface Document: DUNE Physics to Joint CISC Sowjanya Gollapinni et al. Physics
WBS
IPR Oct 2019
Interfaces
CISC
25 Apr 2020
7120-v1 TDR Version - DUNE FD Interface Document: Software and Computing to Joint HV Andrew Norman et al. WBS
IPR Oct 2019
Interfaces
HV
Software and Computing
25 Apr 2020
7066-v2 TDR Version - DUNE FD Interface Document: Calibration to Joint HV Sowjanya Gollapinni et al. WBS
IPR Oct 2019
Interfaces
Calibration
HV
25 Apr 2020
6736-v1 TDR Version - DUNE FD Interface Document: High Voltage to DAQ Georgia Karagiorgi et al. WBS
IPR Oct 2019
Interfaces
DAQ
HV
25 Apr 2020
6679-v3 TDR Version - DUNE FD Interface Document for Single Phase/Joint: SP APA to Joint CISC Anselmo Cervera Villanueva et al. WBS
IPR Oct 2019
Interfaces
CISC
TPC Single-Phase
APA
25 Apr 2020
6730-v5 TDR Version - DUNE FD Interface Document: SP Photon Detector to Joint CISC Anselmo Cervera Villanueva et al. WBS
Photon Detection
IPR Oct 2019
Interfaces
CISC
TPC Single-Phase
25 Apr 2020
6745-v5 TDR Version - DUNE FD Interface Document: SP TPC Electronics to Joint CISC Anselmo Cervera Villanueva et al. WBS
IPR Oct 2019
Interfaces
Electronics
CISC
TPC Single-Phase
25 Apr 2020
6760-v1 TDR Version - DUNE FD Interface Document: DP CRP to Joint CISC Anselmo Cervera Villanueva et al. WBS
IPR Oct 2019
Interfaces
CRP
CISC
TPC Dual-Phase
25 Apr 2020
6781-v2 TDR Version - DUNE FD Interface Document: DP Photon Detector to Joint CISC Burak Bilki et al. WBS
Photon Detection
IPR Oct 2019
Interfaces
CISC
TPC Dual-Phase
25 Apr 2020
6784-v1 TDR Version - DUNE FD Interface Document: DP TPC Electronics to Joint CISC Dario Autiero et al. WBS
IPR Oct 2019
Interfaces
Electronics
CISC
TPC Dual-Phase
25 Apr 2020
7126-v4 TDR Version - DUNE FD Interface Document: Software and Computing to Joint CISC Anselmo Cervera Villanueva et al. WBS
IPR Oct 2019
Interfaces
CISC
Software and Computing
25 Apr 2020
7072-v2 TDR Version - DUNE FD Interface Document: Calibration to Joint CISC Sowjanya Gollapinni et al. WBS
IPR Oct 2019
Interfaces
Calibration
CISC
25 Apr 2020
6790-v2 TDR Version - DUNE FD Interface Document: DAQ to CISC Anselmo Cervera Villanueva et al. WBS
IPR Oct 2019
Interfaces
DAQ
CISC
25 Apr 2020
6787-v3 TDR Version - DUNE FD Interface Document: High Voltage to CISC Anselmo Cervera Villanueva et al. WBS
IPR Oct 2019
Interfaces
HV
CISC
25 Apr 2020
6967-v1 TDR Version - DUNE FD Interface Document: Facility Interfaces to SP APA Farshid Feyzi et al. Far Site CF
WBS
IPR Oct 2019
Cryo Infrastructure
Interfaces
TPC Single-Phase
APA
25 Apr 2020
6970-v1 TDR Version - DUNE FD Interface Document: Facility Interfaces to SP Photon Detection Farshid Feyzi et al. Far Site CF
WBS
Photon Detection
IPR Oct 2019
Cryo Infrastructure
Interfaces
TPC Single-Phase
25 Apr 2020
6973-v5 TDR Version - DUNE FD Interface Document: Facility and Technical Coordination Interfaces to SP TPC Electronics David Christian et al. Far Site CF
WBS
IPR Oct 2019
Cryo Infrastructure
Interfaces
Electronics
TPC Single-Phase
25 Apr 2020
6979-v3 TDR Version - DUNE FD Interface Document: Facility Interfaces to DP Photon Detector Dominique Duchesneau et al. Far Site CF
WBS
Photon Detection
IPR Oct 2019
Cryo Infrastructure
Interfaces
TPC Dual-Phase
25 Apr 2020
6982-v3 TDR Version - DUNE FD Interface Document: Facility Interfaces to DP TPC Electronics Dario Autiero et al. Far Site CF
WBS
IPR Oct 2019
Cryo Infrastructure
Interfaces
Electronics
TPC Dual-Phase
25 Apr 2020
6841-v2 TDR Version - DUNE FD Interface Document: Facility to DUNE Software and Computing Farshid Feyzi et al. Far Site CF
WBS
IPR Oct 2019
Interfaces
Software and Computing
25 Apr 2020
6988-v3 TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint DAQ Farshid Feyzi et al. Far Site CF
WBS
IPR Oct 2019
Cryo Infrastructure
Interfaces
DAQ
25 Apr 2020
6985-v1 TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint HV Farshid Feyzi et al. Far Site CF
WBS
IPR Oct 2019
Cryo Infrastructure
Interfaces
HV
25 Apr 2020
6991-v2 TDR Version - DUNE FD Interface Document: Facility Interfaces to Joint CISC Farshid Feyzi et al. Far Site CF
WBS
IPR Oct 2019
Cryo Infrastructure
Interfaces
CISC
25 Apr 2020
18706-v1 Improve Liquid Argon TPC (LArTPC) Signal Processing with Deep Neural Network Haiwang Yu Prototyping
DUNE Collaboration
Software and Computing
21 Apr 2020
18688-v1 ProtoDUNE. The How and the why. Laura Manenti Prototyping
Physics
Communications
DUNE Collaboration
20 Apr 2020
18661-v1 APS April meeting slides Ajib Paudel ProtoDUNE
18 Apr 2020
42-v33 DUNE Org Charts Maxine Hronek Org/Staffing
IPR Oct 2019
DUNE Collaboration
30 Mar 2020
18367-v1 Target Shield Pile KEK Stripline Feedthrough prototype Update 12-2019 Joseph Angelo Neutrino Beamline
27 Mar 2020
18312-v1 Multifactor authentication: RSA tokens and Yubikeys Author Non-LBNF Communications
Collaborative Tools
20 Mar 2020
17235-v1 DUNE-SP TPC Electronics ASIC/FEMB Preliminary Design Review Charge Steve Kettell et al. Internal
Reviews
13 Jan 2020
17508-v1 DUNE-SP TPC Electronics WIB and System Preliminary Design Review Charge Steve Kettell et al. Internal
Reviews
13 Jan 2020
17519-v1 Muons and Pandora in Dual-Phase geometry Etienne Chardonnet Prototyping
DUNE Collaboration
Software and Computing
13 Jan 2020
16691-v2 Design and Performance of a 35-ton Liquid Argon Time Projection Chamber as a Prototype for Future Very Large Detectors Mark Convery Prototyping
Far Detector
10 Dec 2019
928-v5 ProtoDUNE LAr Flow Simulation- Impurity field and Charge Density Erik A Voirin ProtoDUNE
Purity/Cleanliness/Radiation
Calibration
05 Dec 2019
15974-v3 Calibration factors for protoDUNE production 2 including induction planes for MC Ajib Paudel ProtoDUNE
Prototyping
04 Dec 2019
16976-v1 ZeroMQ on 100 GbE Brett Viren DAQ
15 Nov 2019
16973-v1 DUNE FD DAQ Observability Brett Viren DAQ
15 Nov 2019
16841-v1 Fall 2019 Information on LBNF for South Dakota Neighbors Mike J Headley et al. Communications
04 Nov 2019
14503-v10 LBNC Meeting June 4 2019 Alfons Weber Near Detector
02 Jun 2019
12586-v2 Informational Meeting at Sanford Lab January 2019 (and Oct 2019) Ladia Jakubec et al. Communications
17 Oct 2019
1-v10 DUNE Governance Document Robert J. Wilson Institutional Board
IPR Oct 2019
Collaboration Management
15 Oct 2019
44-v62 LBNF Overall Org Charts Elaine McCluskey Org/Staffing
Director's CD-3A Review of LBNF
DOE CD-3a Review
15 Oct 2019
10317-v6 Notes and Interface document between beamline and NSCF Tom Hamernik et al. Near Site CF
IPR Oct 2019
Interfaces
Beamline
10 Oct 2019
16145-v1 Developing the MeV potential of DUNE: Detailed considerations of muon-induced spallation and other backgrounds Guanying Zhu et al. Cosmic Rays and Cosmogenics
Physics
Solar Neutrinos
Radiological and Cleanliness Models
28 Sep 2019
16142-v1 DUNE as the Next-Generation Solar Neutrino Experiment Francesco Capozzi et al. Physics
Solar Neutrinos
28 Sep 2019
14870-v1 [MIGRATED] DUNE Condensation Prevention with Duct Fans Erik A Voirin Installation/Integration
Cryostat
25 Sep 2019
987-v16 LBNF Org Chart: Project Team with Line Management; Names included Elaine McCluskey Org/Staffing
11 Sep 2019
15944-v3 Neutrino Oscillations in DUNE and Supernovae neutrinos detection Ernesto Kemp Supernova Neutrinos
Neutrino Oscillations
09 Sep 2019
15418-v1 Initial Processing Stages for DUNE FD TPC Data Brett Viren Software and Computing
26 Jul 2019
15031-v2 Looking at the protoDUNE-SP CPA frames using cosmic ray muons Ajib Paudel ProtoDUNE
Prototyping
06 Jul 2019
72-v3 Collaboration Map Maxine Hronek Institutional Board
DUNE Collaboration
01 Jul 2019
519-v2 LBNF Cryostat Condensation Prevention Simulation Erik A Voirin Director's CD-3A Review of LBNF
Cryostat
06 Nov 2017
581-v4 [MIGRATED] LBNF Liquid Argon CFD Simulations - Temperature, Velocity, and Impurity fields Erik A Voirin Director's CD-3A Review of LBNF
Cryogenic Fluids
Cryostat
Ar Systems
15 May 2019
1046-v2 [MIGRATED] LBNF and ProtoDUNE CFD Study - Fluid Impurity Configuration Comparison Erik A Voirin ProtoDUNE
Purity/Cleanliness/Radiation
Cryogenics WG
Ar Systems
15 May 2019
1576-v1 [MIGRATED] CFD Simulation of 24,000 SCFM Argon Leak in Cavern Pit Erik A Voirin Cryo Safety Review Panel
15 May 2019
347-v1 [MIGRATED] Operation Feasibility, membrane cryostat, 50 mbarg design pressure Mark Adamowski ProtoDUNE
DOE
Director's
15 May 2019
14305-v1 dQdx_analysis_of_TPC Ajib Paudel ProtoDUNE
15 May 2019
14083-v1 Overview and Status of the LBNF Cryogenic System Mark Adamowski et al. Cryo Infrastructure
22 Apr 2019
13939-v1 Epochs and Timelines for a DUNE Far Detector DAQ Configuration System Brett Viren DAQ
10 Apr 2019
7626-v2 LBNF/DUNE Requirements Management Plan Nandhini Dhanaraj et al. Requirements
Project Management
Systems Engineering
27 Sep 2018
13223-v1 RFI for LBNF FSCF EXC Troy Lark Procurement
13 Mar 2019
13214-v2 Pandora Reconstruction Metric Figures - ProtoDUNESP Steven Green Physics
ProtoDUNE Sim/Reco
Simulation and Reconstruction
Software and Computing
13 Mar 2019
12721-v2 Considerations for LBNF Optimized Horn Preliminary Design Cory F Crowley Neutrino Beamline
31 Jan 2019
2152-v5 City of Lead Public Meeting Presentation March 2017, Oct 2017, April 2018 Josh Willhite Pipe Conveyor Procurement
Far Site CF
NEPA
Conventional Facilities
18 Jan 2019
8507-v1 Logistics Industry Day talks, 31 May 2018 Mike J Headley et al. Logistics
18 Jan 2019
11791-v6 DUNE Submission to European Strategy Update Edward Blucher et al. Reviews
DUNE Collaboration
07 Jan 2019
12388-v1 High-Pressure Argon gas TPC Option for the DUNE Near Detector Alan Bross et al. HP-GAr-TPC Option
Design Report
04 Jan 2019
1835-v4 Optical Isolators Linda Bagby Electronics
17 Dec 2018
12061-v1 Calibrating dQ /dx and dE /dx for protoDUNE data using cathode crossing cosmic muons Ajib Paudel Prototyping
11 Dec 2018
11983-v1 Overview of LBNF Project to be delivered to Radiate Collaboration Meeting Rob Roser Beamline
09 Dec 2018
11239-v2 LBNF - EXC 60% FD Submission_Drawings Joshua Yacknowitz Far Site CF
Conventional Facilities
05 Dec 2018
11602-v2 Talk at CERN Detector Seminar, Nov 30 2018 Stephen Pordes ProtoDUNE
TPC Single Phase
04 Dec 2018
11539-v1 DUNE: Science, Status and perspectives Luca Stanco Physics
Reviews
DUNE Collaboration
Far Detector
Near Detector
28 Nov 2018
11479-v1 Zip of lift of first APA to arrive at EHN1 Roberto Acciarri ProtoDUNE
Prototyping
Installation/Integration
TPC Single Phase
26 Nov 2018
11464-v1 Movie of non-insulating rubber in pipe clamp Stephen Pordes Prototyping
Installation/Integration
Electronics
TPC Single Phase
24 Nov 2018
11461-v1 What are the DUNE FD DAQ Bottlenecks? Brett Viren DAQ
23 Nov 2018
11179-v2 LBNF Requirements Review Template Comments Document Nandhini Dhanaraj Requirements
30 Oct 2018
10773-v3 The LBNF Flux Determination Mary Bishai Beamline
16 Oct 2018
10482-v1 A System for Communication Between DAQ Elements Brett Viren DAQ
02 Oct 2018
10464-v1 ProtoDUNE SP: Chronicles of an endeavor - Wine&Cheese Seminar - FNAL - Sept.28,2018 Flavio Cavanna Prototyping
Communications
01 Oct 2018
10012-v1 DUNE Talk at 2018 Users Meeting Stefan Soldner-Rembold Communications
DUNE Collaboration
Near Detector
31 Aug 2018
9934-v1 Video recordings from filling of NP04 cryostat Edgar Valencia ProtoDUNE
Prototyping
Argon and Cryogenics Instrumentation
22 Aug 2018
9787-v7 The Science and Design of the LBNF Beamline Mary Bishai Beamline
14 Aug 2018
9724-v3 Valencia and Hawaii Profilers Geometry .. Anselmo Cervera Villanueva et al. ProtoDUNE
Prototyping
Argon and Cryogenics Instrumentation
13 Aug 2018
9318-v2 Moving Temperature Profiler moving instructions Brianne Hackett ProtoDUNE
Prototyping
Argon and Cryogenics Instrumentation
07 Aug 2018
9613-v2 NCAB - Presentations Tracy Lundin Far Site CF
01 Aug 2018
9549-v1 LabVIEW Motor Drive software for ProtoDUNE Temperature profiler Author Non-Collaborator Prototyping
17 Jul 2018
9423-v1 Doping Liquid Argon with Xenon: Enhancing Light Production and Collection Efficiency Carlos O Escobar Photon Detection
Far Detector
13 Jul 2018
4559-v12 Optimized Beam CDR Phil Adamson et al. Neutrino Beamline
Design Report
11 Jul 2018
8864-v1 NCAB - Background Supporting Documents Tracy Lundin Far Site CF
28 Jun 2018
8408-v3 Design and Analysis of CRT Mechanical Support Structures for ProtoDUNE Benjamin K Stillwell ProtoDUNE
11 Jun 2018
8567-v1 DocBD Primer Jennifer Raaf DUNE Collaboration
06 Jun 2018
8414-v1 Drawings for assembly CRT module support frames Benjamin K Stillwell ProtoDUNE
25 May 2018
8411-v1 MayTec Construction Documentation for assembly of CRT module support frames Benjamin K Stillwell ProtoDUNE
25 May 2018
8339-v2 Cold Electronics system for ProtoDUNE-SP LAr-TPC Maura Spanu et al. ProtoDUNE
Electronics
24 May 2018
4787-v11 Cryogenic Test System Carl Bromberg et al. Electronics
Far Detector
16 May 2018
5252-v1 Teamcenter Requirements Management evaluation Anne Heavey Requirements
11 May 2018
3450-v9 protoDUNE Single Phase Computing and Software Plans Bruce Baller et al. ProtoDUNE
09 May 2018
5198-v1 ProtoDUNE Beam Instrumentation Database Requirements Andrew Norman et al. Software and Computing
05 Apr 2018
7782-v1 Simulation of Detector Forces from Large Leak During Pressure Test (ProtoDUNE) Erik A Voirin Cryostat
26 Mar 2018
6640-v1 FEA of DS decay pipe window for optimized design Haijing Wang Beamline
06 Mar 2018
1315-v1 35ton Lessons Learned Compilation Michelle Stancari 35t Prototype
TPC Single-Phase
27 May 2016
3009-v2 ProtoDUNE UTA DP Field Cage PRR Documents Kevin Fahey ProtoDUNE
Internal
Quality Assurance
02 Mar 2018
7440-v1 Meeting Minutes Craig Drennan Neutrino Beamline
23 Feb 2018
1701-v3 ProtoDUNE WIB Output Data Formats Eric Hazen et al. ProtoDUNE
Internal
Electronics
13 Dec 2017
6212-v1 Risk Workshop Intro - Dec 2017 Elaine McCluskey Risk Management
01 Dec 2017
4064-v3 Single-Phase protoDUNE TPC Numbers Brett Viren ProtoDUNE
29 Nov 2017
5882-v3 nnbar oscillation search practice talk for INT 2017 Georgia Karagiorgi Proton Decay
24 Oct 2017
5837-v4 THSP Hatch Covers, Stripline Feedthroughs, and Prototypes Joseph Angelo Beamline
23 Oct 2017
5759-v2 Dune Data Management Plan Andrew Norman Software and Computing
16 Oct 2017
5504-v2 NUFACT Talk: DUNE Near Detectors Hongyue Duyang Near Detector
10 Oct 2017
3159-v1 DUNE EC PUBLIC MINUTES Maxine Hronek Executive Board
04 Oct 2017
1938-v11 ProtoDUNE-SP Software and Computing Project Plan Thomas Junk et al. ProtoDUNE
Software and Computing
03 Oct 2017
2158-v3 Status of DUNE Jonathan Insler ProtoDUNE
DUNE Collaboration
27 Sep 2017
2114-v3 APS talk: Study of Track Ambiguities and Wire Plane Orientation in Single Phase Liquid Argon Time Projection Chambers Author Non-Collaborator et al. Far Detector Sim/Reco
27 Sep 2017
2123-v1 APS 2017 Long-Baseline Talk Elizabeth Worcester Analysis
27 Sep 2017
2121-v1 Proton Decay Searches with DUNE and the Photon Detection System -- APS Talk Kevin Wood Simulation and Reconstruction
Photon Detection
Proton Decay
27 Sep 2017
4583-v6 Selection of charged-current muon-neutrino and electron-neutrino interactions in the DUNE far detector Tyler Alion et al. Neutrino Oscillations
27 Sep 2017
5519-v1 Status of LBNF beamline Tristan Davenne Primary Beamline
Communications
Conventional Facilities
27 Sep 2017
4313-v3 LBNF Cryostat #1 Steel Structure (Warm Structure) Final Design Review Elaine McCluskey Internal
Cryostat
21 Sep 2017
5525-v1 Supernova Neutrinos, Proton Decay and Atmospheric Neutrinos at DUNE Juergen Reichenbacher Atmospheric Neutrinos
Supernova Neutrinos
DUNE Collaboration
Proton Decay
Far Detector
Radiological and Cleanliness Models
21 Sep 2017
5378-v1 The Long-Baseline Neutrino Facility David Montanari Cryo Infrastructure
14 Sep 2017
5105-v1 interface meeting Marzio Nessi Internal
24 Aug 2017
5042-v2 storage for materials underground at FS & access processes Michael Andrews Cryostat
23 Aug 2017
5066-v1 SP Dune feed thru talk at interface meeting Jack Fowler Cryostat
23 Aug 2017
5054-v1 Cryostat construction to detector installation transition Jim Stewart Interfaces
Far Detector
23 Aug 2017
5078-v1 LBNF/Dune SP Mezzanine Interface Jack Fowler Cryo Infrastructure
Installation/Integration
Systems Engineering
23 Aug 2017
5045-v1 Interface Meeting Presentations - August 23, 2017 - Lundin Tracy Lundin Far Site CF
Systems Engineering
23 Aug 2017
191-v1 LBNF/DUNE CDR Annex 3A: Beamline at the Near Site Beamline Group Design Report
Beamline
18 Aug 2017
4895-v1 Status of LBNF/DUNE Albert De Roeck Physics
09 Aug 2017
2139-v1 Supporting Environmental Documentation Rod Walton Near Site CF
Far Site CF
NEPA
07 Aug 2017
188-v1 LBNF/DUNE CDR Annex 4A: The LBNE Design for a Deep Underground Single-Phase Liquid Argon TPC Jim Stewart Design Report
Far Detector
19 Jul 2017
4-v6 DUNE logos Maury Goodman DUNE Collaboration
Forms, Templates, Logos
19 Jul 2017
3974-v1 Overview of the LBNF Cryogenic System Mark Adamowski et al. Cryo Infrastructure
14 Jul 2017
4337-v3 Status of the LBNF Cryogenic System Mark Adamowski et al. Cryo Infrastructure
12 Jul 2017
3633-v4 Cold ADC performance: time dependence David L Adams Electronics
Electronics
23 Jun 2017
4160-v1 DUNE cold ADC performance David L Adams Electronics
23 Jun 2017
4088-v1 Conclusions of the 2nd ND workshop Kam-Biu Luk et al. Near Detector
19 Jun 2017
3836-v5 DUNE: Status and Prospects Luke A. Corwin Neutrino Oscillations
09 Jun 2017
960-v2 DOE-CERN Protocol Agreements Author Non-LBNF MOU
05 May 2017
770-v1 MA 607915 - FSCF Project Management Sandra Efstathiou Procurement
18 Nov 2015
2617-v1 DUNE LAr CFD Simulation with Supply and Return Manifolds Erik A Voirin Cryogenic Fluids
Purity/Cleanliness/Radiation
31 Mar 2017
2783-v1 Step file of protoDUNE-SP (NP04) assembly as of Jan 4 2017 Jack Fowler ProtoDUNE
Cryo Infrastructure
20 Mar 2017
1628-v1 The clustered storage option for the protoDUNE NP04 Online Buffer Nektarios Benekos ProtoDUNE
10 Mar 2017
2196-v1 LBNF –WireHoseHorn In Decay Pipe Milorad Popovic Neutrino Beamline
15 Feb 2017
716-v1 Critical Decision 1 Approval for LBNF/DUNE Author Non-Collaborator DOE CD-3a Review
Project Management
06 Feb 2017
597-v1 DUNE/LBNF CDR Volume 1: The LBNF and DUNE Projects (updated Intro to CDR) Mary Bishai et al. Director's CD-3A Review of LBNF
Design Report
DUNE Collaboration
Project Management
24 Jan 2017
180-v1 (OLD) DUNE/LBNF CDR Volume 1: The LBNF and DUNE Projects Mary Bishai et al. Director's CD-3A Review of LBNF
Design Report
DUNE Collaboration
Project Management
24 Jan 2017
182-v1 (OLD) LBNF/DUNE CDR Volume 3: The Long-Baseline Neutrino Facility for DUNE Tom Hamernik et al. Cryo Infrastructure
Design Report
Beamline
Conventional Facilities
24 Jan 2017
2089-v1 Proposed Initial Data Reduction for protoDUNE/SP Xin Qian et al. ProtoDUNE
Online/Offline Interface
Data Handling
18 Jan 2017
1212-v6 Design of the Data Management System for the protoDUNE Experiment Stu Fuess et al. Online/Offline Interface
Data Handling
13 Dec 2016
2013-v1 Optimization of the LBNF/DUNE beamline for tau neutrinos Author Non-LBNF et al. Neutrino Beamline
Neutrino Oscillations
11 Dec 2016
1869-v2 LBNF Overview for Cryo Operations Workshop Christopher Mossey Conventional Facilities
26 Oct 2016
1816-v1 35 ton online purity Jonathan Davies 35t Prototype
13 Oct 2016
1798-v1 Simulation of filling tank with Argon Zhijing Tang Purity/Cleanliness/Radiation
05 Oct 2016
1232-v1 ProtoDUNE Ullage space CFD simulation Erik A Voirin ProtoDUNE
Cryogenic Fluids
Ar Systems
27 Sep 2016
1766-v1 CD-3a Approve Initial Far Site Construction for LBNF/DUNE Author Non-Collaborator DOE CD-3a Review
Project Management
23 Sep 2016
183-v2 DUNE/LBNF CDR Volume 4: The DUNE Detectors at LBNF Maury Goodman et al. Prototyping
Director's CD-3A Review of LBNF
DOE CD-3a Review
Design Report
Far Detector
Near Detector
22 Sep 2016
181-v2 DUNE/LBNF CDR Volume 2: The Physics Program for DUNE at LBNF Mary Bishai et al. Physics
Director's CD-3A Review of LBNF
DOE CD-3a Review
Design Report
22 Sep 2016
1759-v1 Cryo Instrumentation used in LAPD and 35 Ton Cryostats Alan A Hahn ProtoDUNE
Cryo Infrastructure
35t Prototype
22 Sep 2016
1156-v1 35 Ton LAr Impurity Distribution Measurements and CFD simulation Erik A Voirin 35t Prototype
Purity/Cleanliness/Radiation
Cryogenics WG
13 Sep 2016
1696-v1 DUNE/SBND Cold Electronics Design Review Eric James Internal
Electronics
13 Sep 2016
1656-v1 Minimum Multiplicity Requirements for ProtoDUNE DAQ and Online/Offline Buffer Subsystems Brett Viren ProtoDUNE
28 Aug 2016
1498-v1 Sanford Lab (SURF) logo Author Non-LBNF Forms, Templates, Logos
19 Jul 2016
1497-v1 SURF Environment, Health and Safety Sustainability Author Non-LBNF ES&H
19 Jul 2016
1403-v1 NuMI Hadron Monitor Bob Zwaska Neutrino Beamline
27 Jun 2016
1369-v1 EMShower Reconstruction Michael Wallbank Simulation and Reconstruction
21 Jun 2016
1329-v4 Do Neutrino Oscillations Conserve Energy? Kirk McDonald Neutrino Oscillations
19 Jun 2016
1326-v4 Charging of an Insulator in a Liquid Argon Detector Kirk McDonald HV
10 Jun 2016
1324-v6 LBNF/DUNE and the Hunt for Leptonic CP Violation Mary Bishai Physics
09 Jun 2016
1343-v1 LBNF CM/GC Far Site Facilities RFP and Sample Subcontract Greg Wray Procurement
08 Jun 2016
1331-v1 Fermilab-LBNF Project Title Block Logos Author Non-LBNF Forms, Templates, Logos
02 Jun 2016
1328-v1 Path Length of Muons Traversing an Arbitrary Volume Kirk McDonald Cosmic Rays and Cosmogenics
01 Jun 2016
1327-v1 Space Charge in Ionization Detectors Kirk McDonald Analysis
HV
01 Jun 2016
54-v1 The Blurred Clustering Reconstruction Technique Michael Wallbank Analysis
26 May 2016
1247-v1 COLDATA DAQ Output -- open issues Eric Hazen Electronics
03 May 2016
1167-v2 Beamline Technical Board meeting April 1 2016 - News and Plans Vaia Papadimitriou Beamline
13 Apr 2016
994-v3 LBNF/DUNE James Strait Prototyping
Physics
Far Detector
Near Detector
Beamline
05 Apr 2016
1130-v1 A look at Huffman Coding Applied to 35t Data Brett Viren 35t Prototype
Data Handling
20 Mar 2016
1106-v1 Agenda for the 18 March 2016 IB Phone Meeting Maury Goodman Institutional Board
14 Mar 2016
1057-v4 Neutrino Production with Proton Drivers Mary Bishai Neutrino Beamline
11 Mar 2016
1054-v1 Comments on Target Station configuration about He-filled vessel from the operation experience of the J-­PARC Neutrino beam­line Author Non-LBNF Beamline
23 Feb 2016
1053-v1 LBNF Nitrogen in target pile & DK cooling James Hylen Neutrino Beamline
22 Feb 2016
1051-v1 LBNF/DUNE brochure Feb. 2016 Author Non-Collaborator et al. Communications
19 Feb 2016
1040-v1 Collaboration DB Analysis Eileen F Berman Collaborative Tools
15 Feb 2016
1017-v1 Progress of gas-filled RF Hadron Monitor study Katsuya Yonehara Neutrino Beamline
Beamline
10 Feb 2016
988-v1 Translations of articles on LBNF and DUNE Author Non-LBNF Communications
04 Feb 2016
972-v1 Far Site Waste Rock Handling Options - August 2014 Syd De Vries Far Site CF
27 Jan 2016
278-v1 CDR Volume 1: The LBNE Project Mary Bishai Physics
DOE
Design Report
25 Jan 2016
940-v1 Collaboration Photo from the January 2016 Arlington Meeting Jae Yu DUNE Collaboration
14 Jan 2016
934-v1 Jyvaskyla presentation to DUNE IB Author Non-Collaborator Institutional Board
13 Jan 2016
158-v2 DUNE Far Detector 1 Parameters spreadsheet Russ Rucinski Director's CD-3A Review of LBNF
DOE CD-3a Review
Project Management
17 Nov 2015
143-v1 LBNE CD-1 Approve Alternative Selection and Cost Range Author Non-LBNF Director's CD-3A Review of LBNF
Project Management
16 Nov 2015
598-v1 LBNF Far Site Conventional Facilities Preliminary Design Report (PDR) Tracy Lundin et al. Far Site CF
Director's CD-3A Review of LBNF
DOE CD-3a Review
Design Report
16 Nov 2015
142-v1 LBNE CD-0 Mission Need Statement Author Non-LBNF Director's CD-3A Review of LBNF
DOE CD-3a Review
Project Management
16 Nov 2015
599-v2 The Long-Baseline Neutrino Facility for DUNE: updated Volume 3 to CDR Elaine McCluskey Far Site CF
Director's CD-3A Review of LBNF
DOE CD-3a Review
Cryo Infrastructure
Design Report
Beamline
11 Nov 2015
313-v1 Guanajuato presentation at IB meeting Author Non-LBNF Institutional Board
02 Nov 2015
29-v5 The Deep Underground Neutrino Experiment Maury Goodman Physics
DUNE Collaboration
02 Nov 2015
691-v1 LBNF Status - 23 Oct 2015 Christopher Mossey Briefs
23 Oct 2015
587-v2 Fermilab Beamlines: Present and Future Mary Bishai Neutrino Beamline
13 Oct 2015
314-v1 LBNF/DUNE CDR Annex 3C: Conventional Facilities (CF) at the Far Site Tracy Lundin et al. Far Site CF
Director's CD-3A Review of LBNF
Design Report
12 Oct 2015
523-v1 CD-3a Director's Review agenda, charge, committee Author Non-LBNF Director's
Project Management
02 Oct 2015
85-v1 LBNF Beamline Interface Definition 21 Dave Pushka et al. Neutrino Beamline
01 Oct 2015
487-v1 LBNF/DUNE Overview for UMN Elaine McCluskey Project Management
28 Sep 2015
481-v1 LBNF/DUNE Fact Sheet Author Non-Collaborator Communications
24 Sep 2015
319-v1 LBNF/DUNE CDR Annex 3B, Conventional Facilities (CF) at the Near Site Tom Hamernik et al. Near Site CF
Design Report
23 Sep 2015
425-v1 Excerpt from Mission Need Statement for a Long Baseline Neutrino Experiment Author Non-Collaborator Project Management
11 Sep 2015
426-v1 Report of the US long baseline neutrino experiment study Milind Diwan Physics
11 Sep 2015
420-v3 DUNE Digital Data Management Plan Chang-Kee Jung et al. Software and Computing
10 Sep 2015
27-v2 Minutes of the DUNE Institutional Board, 5 June 2015 Maury Goodman Institutional Board
08 Sep 2015
339-v1 LBNE-India Detailed Project Report (DPR) submitted to DAE, India Sanjib Mishra et al. DOE
Director's
Electronics
Near Detector Physics
HV
Near Detector
04 Sep 2015
275-v1 Report on the Depth Requirements for a Massive Detector at Homestake Milind Diwan Physics
Requirements
Conventional Facilities
02 Sep 2015
205-v3 LBNF Kicker Capacitor Specification Luciano Elementi Near Site CF
Primary Beamline
Internal
Requirements
Procurement
Budget
31 Aug 2015
116-v1 Risk Schedule 08-2015 Anne Heavey Risk Management
30 Aug 2015
150-v1 FSCF Requirements and Interface Review Charge James Strait Far Site CF
Internal
28 Aug 2015
135-v1 Talks during pre-risk workshop prep meetings Aug 2015 Author Non-LBNF et al. Far Site CF
Risk Management
27 Aug 2015
87-v0 LBNF Beamline Interface Definition 41 Dave Pushka Neutrino Beamline
Systems Integration
21 Aug 2015
91-v0 LBNF Beamline Interface Definition 116 Dave Pushka Neutrino Beamline
Systems Integration
21 Aug 2015
90-v0 LBNF Beamline Interface Definition 122 Dave Pushka Neutrino Beamline
Systems Integration
21 Aug 2015
89-v0 LBNF Beamline Interface Definition 73 Dave Pushka Neutrino Beamline
Systems Integration
21 Aug 2015
88-v0 LBNF Beamline Interface Definition 61 Dave Pushka Neutrino Beamline
Systems Integration
21 Aug 2015
86-v0 LBNF Beamline Interface Definition 89 Dave Pushka Near Site CF
Neutrino Beamline
21 Aug 2015
84-v0 LBNF Beamline Interface Definition 11 Dave Pushka Neutrino Beamline
21 Aug 2015
59-v1 Map of DUNE institutions Anne Heavey Institutional Board
13 Aug 2015
40-v1 DUNE/LBNF 3-horn Design Study Mary Bishai Beam Simulation
04 Aug 2015
37-v1 FEMB Noise vs Wire Maps on APAs Alan A Hahn Conventional Facilities
TPC Single-Phase
31 Jul 2015
2-v1 Collaboration Photo April 2015 Maury Goodman DUNE Collaboration
30 Apr 2015

Number of documents found: 302

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List/Add Authors ] [ Events ] [ DUNE Help ] [ Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact Service Desk



DocDB Version 8.8.9, contact Document Database Administrators
Execution time: 53 wallclock secs ( 8.14 usr + 3.06 sys = 11.20 CPU)