These documents on Reviews and sub-topics are available:
Showing documents with topic Reviews on the most recent version. See documents with Reviews on any version.

DUNE-doc-# Title Author(s) Topic(s) Last Updated
1-v10 DUNE Governance Document Robert J. Wilson Collaboration Management
IPR Oct 2019
Institutional Board
15 Oct 2019
44-v62 LBNF Overall Org Charts Elaine McCluskey DOE CD-3a Review
Director's CD-3A Review of LBNF
Org/Staffing
15 Oct 2019
42-v32 DUNE Org Charts Eric James IPR Oct 2019
Org/Staffing
DUNE Collaboration
14 Oct 2019
602-v3 The LBNF Cryogenics Infrastructure at the Far Site Min Jeong Kim et al. DOE CD-3a Review
IPR Oct 2019
Director's CD-3A Review of LBNF
Design Report
Cryo Infrastructure
14 Oct 2019
2096-v2 LBNF Target Chase Nitrogen Fill & Purge System Initial Design Dave Pushka Mechanical
Beamline
20 Apr 2017
122-v4 Environmental Assessment, FONSI, and Environmental Review Forms Rod Walton Far Site CF
NEPA
Near Site CF
IPR Jul 2019
14 Oct 2019
10317-v6 Notes and Interface document between beamline and NSCF Tom Hamernik et al. IPR Oct 2019
Near Site CF
Beamline
Interfaces
10 Oct 2019
581-v4 [MIGRATED] LBNF Liquid Argon CFD Simulations - Temperature, Velocity, and Impurity fields Erik A Voirin Director's CD-3A Review of LBNF
Cryostat
Cryogenic Fluids
Ar Systems
15 May 2019
347-v1 [MIGRATED] Operation Feasibility, membrane cryostat, 50 mbarg design pressure Mark Adamowski ProtoDUNE
Director's
DOE
15 May 2019
11791-v6 DUNE Submission to European Strategy Update Edward Blucher et al. Reviews
DUNE Collaboration
07 Jan 2019
11539-v1 DUNE: Science, Status and perspectives Luca Stanco Near Detector
Far Detector
Reviews
Physics
DUNE Collaboration
28 Nov 2018
3009-v2 ProtoDUNE UTA DP Field Cage PRR Documents Kevin Fahey ProtoDUNE
Quality Assurance
Internal
02 Mar 2018
1701-v3 ProtoDUNE WIB Output Data Formats Eric Hazen et al. ProtoDUNE
Electronics
Internal
13 Dec 2017
4313-v3 LBNF Cryostat #1 Steel Structure (Warm Structure) Final Design Review Elaine McCluskey Cryostat
Internal
21 Sep 2017
5105-v1 interface meeting Marzio Nessi Internal
24 Aug 2017
716-v1 Critical Decision 1 Approval for LBNF/DUNE Author Non-Collaborator DOE CD-3a Review
Project Management
06 Feb 2017
597-v1 DUNE/LBNF CDR Volume 1: The LBNF and DUNE Projects (updated Intro to CDR) Mary Bishai et al. Project Management
Director's CD-3A Review of LBNF
Design Report
DUNE Collaboration
24 Jan 2017
180-v1 (OLD) DUNE/LBNF CDR Volume 1: The LBNF and DUNE Projects Mary Bishai et al. Project Management
Director's CD-3A Review of LBNF
Design Report
DUNE Collaboration
24 Jan 2017
1766-v1 CD-3a Approve Initial Far Site Construction for LBNF/DUNE Author Non-Collaborator DOE CD-3a Review
Project Management
23 Sep 2016
183-v2 DUNE/LBNF CDR Volume 4: The DUNE Detectors at LBNF Maury Goodman et al. Near Detector
Far Detector
DOE CD-3a Review
Prototyping
Director's CD-3A Review of LBNF
Design Report
22 Sep 2016
181-v2 DUNE/LBNF CDR Volume 2: The Physics Program for DUNE at LBNF Mary Bishai et al. DOE CD-3a Review
Director's CD-3A Review of LBNF
Physics
Design Report
22 Sep 2016
1696-v1 DUNE/SBND Cold Electronics Design Review Eric James Electronics
Internal
13 Sep 2016
278-v1 CDR Volume 1: The LBNE Project Mary Bishai Physics
Design Report
DOE
25 Jan 2016
158-v2 DUNE Far Detector 1 Parameters spreadsheet Russ Rucinski DOE CD-3a Review
Project Management
Director's CD-3A Review of LBNF
17 Nov 2015
143-v1 LBNE CD-1 Approve Alternative Selection and Cost Range Author Non-LBNF Project Management
Director's CD-3A Review of LBNF
16 Nov 2015
598-v1 LBNF Far Site Conventional Facilities Preliminary Design Report (PDR) Tracy Lundin et al. Far Site CF
DOE CD-3a Review
Director's CD-3A Review of LBNF
Design Report
16 Nov 2015
142-v1 LBNE CD-0 Mission Need Statement Author Non-LBNF DOE CD-3a Review
Project Management
Director's CD-3A Review of LBNF
16 Nov 2015
599-v2 The Long-Baseline Neutrino Facility for DUNE: updated Volume 3 to CDR Elaine McCluskey Far Site CF
DOE CD-3a Review
Director's CD-3A Review of LBNF
Beamline
Design Report
Cryo Infrastructure
11 Nov 2015
314-v1 LBNF/DUNE CDR Annex 3C: Conventional Facilities (CF) at the Far Site Tracy Lundin et al. Far Site CF
Director's CD-3A Review of LBNF
Design Report
12 Oct 2015
523-v1 CD-3a Director's Review agenda, charge, committee Author Non-LBNF Project Management
Director's
02 Oct 2015
339-v1 LBNE-India Detailed Project Report (DPR) submitted to DAE, India Sanjib Mishra et al. Near Detector
Electronics
Director's
Near Detector Physics
DOE
HV
04 Sep 2015
205-v3 LBNF Kicker Capacitor Specification Luciano Elementi Procurement
Primary Beamline
Near Site CF
Budget
Requirements
Internal
31 Aug 2015
150-v1 FSCF Requirements and Interface Review Charge James Strait Far Site CF
Internal
28 Aug 2015

Number of documents found: 33

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List/Add Authors ] [ Events ] [ DUNE Help ] [ Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact Service Desk



DocDB Version 8.8.9, contact Document Database Administrators
Execution time: 18 wallclock secs ( 2.88 usr + 1.07 sys = 3.95 CPU)