Document Database (DocDB) for DUNE and LBNF


DocDB Home ]  [ Search ] [ Last 20 Days ] [ List/Add Authors ] [ Events ] [ DUNE Help ] [ Topics ]

These documents on Systems Engineering and sub-topics are available:
Showing documents with topic Systems Engineering on the most recent version. See documents with Systems Engineering on any version.

DUNE-doc-# Title Author(s) Topic(s) Last Updated
10317-v6 Notes and Interface document between beamline and NSCF Tom Hamernik et al. Beamline
Interfaces
Near Site CF
08 Jul 2019
7626-v2 LBNF/DUNE Requirements Management Plan Nandhini Dhanaraj et al. Systems Engineering
Project Management
Requirements
27 Sep 2018
11179-v2 LBNF Requirements Review Template Comments Document Nandhini Dhanaraj Requirements
30 Oct 2018
5252-v1 Teamcenter Requirements Management evaluation Anne Heavey Requirements
11 May 2018
3009-v2 ProtoDUNE UTA DP Field Cage PRR Documents Kevin Fahey ProtoDUNE
Quality Assurance
Internal
02 Mar 2018
6212-v1 Risk Workshop Intro - Dec 2017 Elaine McCluskey Risk Management
01 Dec 2017
5054-v1 Cryostat construction to detector installation transition Jim Stewart Far Detector
Interfaces
23 Aug 2017
5078-v1 LBNF/Dune SP Mezzanine Interface Jack Fowler Systems Engineering
Cryo Infrastructure
Installation/Integration
23 Aug 2017
5045-v1 Interface Meeting Presentations - August 23, 2017 - Lundin Tracy Lundin Far Site CF
Systems Engineering
23 Aug 2017
275-v1 Report on the Depth Requirements for a Massive Detector at Homestake Milind Diwan Physics
Conventional Facilities
Requirements
02 Sep 2015
205-v3 LBNF Kicker Capacitor Specification Luciano Elementi Procurement
Primary Beamline
Budget
Requirements
Internal
Near Site CF
31 Aug 2015
116-v1 Risk Schedule 08-2015 Anne Heavey Risk Management
30 Aug 2015
135-v1 Talks during pre-risk workshop prep meetings Aug 2015 Author Non-LBNF et al. Risk Management
Far Site CF
27 Aug 2015

Number of documents found: 13

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List/Add Authors ] [ Events ] [ DUNE Help ] [ Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact Service Desk



DocDB Version 8.8.9, contact Document Database Administrators
Execution time: 15 wallclock secs ( 1.58 usr + 0.54 sys = 2.12 CPU)